The Impact of Palazzolo and Other Recent Cases on
Ripeness and Forum Selection in Takings Cases
Thomas E. Roberts
Professor of Law
Wake Forest University School of
Law
Winston-Salem, North Carolina
I.
Introduction
II.
Ripeness
A. The Basics
B. Palazzolo v. Rhode Island
C. Ripeness after Palazzolo
III.
Forum Selection Under Williamson County
and First English
A. The Often Overlooked Connection Between Williamson County and First English
B. Nature of the Cause of Action: “claims for just
compensation are grounded in the Fifth Amendment”
C. Preclusive Consequences of State
Court Action
(1)
Rooker-Feldman Doctrine
(a) Compared to Preclusion and Abstention
(b) Applications of Rooker-Feldman
in Land Use Cases: Anderson v. Charter Township of Ypsilanti
(2)
Res Judicata/Collateral Estoppel (Claim and Issue Preclusion)
D. Possible Exceptions Allowing a
Suit in Federal District Court
(1)
Futility of Using State Court
(2)
Reservation à la England
(3)
Diversity Jurisdiction: Vulcan Materials
Co. v. City of Tehuacana
(4)
Supplemental Jurisdiction: Appending a State Takings Claim
(5) Supplemental Jurisdiction: Appending an
“Otherwise Incomplete” Federal Takings Claim
(6)
Removal
(a) Consequences of Government Removal
(b) College of Surgeons and Support for the
Exercise of Jurisdiction Upon Removal
I. Introduction
Establishing ripeness and
determining the appropriate forum in regulatory takings litigation requires
consideration of a complex set of issues.
Williamson County Regional
Planning Commission v. Hamilton Bank of Johnson City [1] and First English
Evangelical Lutheran Church v. County of Los Angeles,[2] establish the basics with respect to takings actions
against state and local governments.
There are two requirements. Before bringing an as applied regulatory
takings claim a property owner must obtain a final decision from the
authorities as to how the property can be used. The second requirement is that
all takings claims[3] be filed in state court.
The first prong is based on the idea that a court cannot determine
whether a regulation has gone “too far” without knowing “how far” it goes. The
second stems from the fact that the Fifth Amendment takings clause does not
proscribe takings, but only takings without compensation. Thus, state remedies
for compensation must be pursued.
This paper examines the basic rules
of ripeness and forum selection and includes the impact of the United States
Supreme Court’s decision in Palazzolo v.
Rhode Island as well as cases from the Fifth Circuit, Vulcan Materials Co. v. City of Tehuacana and Sixth Circuit, Anderson v. Charter Township of Ypsilanti.
II. Ripeness[4]
A. The Basics
In Williamson County, a
developer received preliminary plat approval in 1973 for a cluster home
development from the planning commission.
The developer then conveyed open space easements to the county and began
putting in roads and utility lines.
Over the next few years, the commission reapproved the preliminary plans
on several occasions. In 1977, the
county changed the density provisions of its zoning ordinance and in 1979 it
advised the developer that its project was subject to the 1977 ordinance. The commission rejected revised plats
submitted in 1980 and 1981 for numerous reasons, some based on the new law and
some based on the old law. The
developer then brought suit in federal court.
The Court found the action unripe,
noting that a taking claim is premature until the "government entity charged
with implementing the regulation has reached a final decision."[5] This had not
occurred since the developer had not "sought variances that would have
allowed it to develop the property according to its proposed plat."[6] While the developer
contended that it had done everything possible to resolve the matter, the Court
was not convinced that a final decision had been obtained. The Court noted that the Board of Zoning
Appeals had the authority to grant variances dealing with five of the eight
objections, and that the commission itself had the power to grant variances to
solve the other objections.
A year after Williamson County, the Court decided MacDonald, Sommer & Frates v. Yolo County[7]. There, the
developer submitted a preliminary plan to subdivide its residentially zoned
land into 159 lots for single family and multi-family housing. After the planning commission rejected the
plan due to inadequacies in access, police protection, water and sewer
services, the developer filed suit asserting that its property was being
condemned to open space.
The Court found the action was not
ripe since the developer had not obtained a final decision as to what kind of
development would be allowed. The
developer failed to convince the Court that it had, with its one application,
done enough. "Unfair procedures, [or] futile [ones]" need not be
pursued, said the Court, but the "rejection of exceedingly grandiose
development plans does not logically imply that less ambitious plans will
receive similarly unfavorable reviews."[8]
Williamson
County and MacDonald require that
a challenger obtain a final decision on a meaningful application for
development to make an as-applied taking action ripe. Physical taking claims are not subject to the final decision
requirement since the physical invasion itself establishes what has been taken.[9] Likewise, a
property owner making a facial taking claim is not subject to the final
decision rule since, by definition, the mere enactment of the law, and not its
application, takes the property.[10]
The final decision requirement is
theoretically distinct from the requirement of exhaustion of administrative
remedies, but in practice the distinction blurs. The former addresses whether one must seek some confirmation by
the initial decisionmaker that a denial is final, and the latter addresses
whether one is obligated to climb the administrative ladder to seek review of
that final decision. For ripeness
purposes, resort to a board of adjustment, for example, is required if the
board possesses the power to waive or grant a variance from a regulation, but
is not required if the board has only the power to review the application of
the regulation. Williamson County provides an example. The Court said the property owner had to seek permission of both
the board of adjustment and the planning commission for variances because both
bodies had the power to relieve the property owner of the alleged hardships.[11] But, the Court said
the developer would not be required to appeal the planning commission's
rejection of the plat to the board of adjustment since the board had the power
only to review, not participate in, that decision.[12]
Identifying the initial
decisionmaker is troublesome, and case law instructs that it is a mistake to
view the term "initial decisionmaker" narrowly. The driving force
behind the rule is to give the governing body a "realistic opportunity and
reasonable time within which to review its zoning legislation vis-a-vis the
particular property."[13] Resort to the
legislative body may be necessary where the current zoning classification is
dated.[14] In seeking a final
decision, if a variance or other procedure exists that might permit the project
to proceed, it must be used unless applying would be futile.
When the MacDonald Court suggested that the denial of "exceedingly
grandiose" plans did not mean that "less ambitious plans" would
also be rejected, it created an obligation of reapplication in situations where
the initial application is not a realistic one. Determining when that obligation arises is a guessing game with
but few clues, only some of which are helpful.
The Court, for example, referred to the MacDonald project as an "intense type of residential
development," and intimated that the "`five Victorian mansions'"
sought in Agins v. City of Tiburon
and the nuclear power plant in San Diego
Gas & Electric Co. v. City of San Diego were of the grandiose variety.[15] The proposed
fifty-five story office tower atop Grand Central Station in the Penn Central case was also likely
"grandiose" in the ripeness sense, since the Court noted that the
landmark commission might approve a smaller tower.
In Suitum v. Tahoe Regional Planning Authority,[16] the Court addressed final decision ripeness in the context
of transferable development rights. In Suitum, the landowner had received a
final decision from the land use authority that she could not build on her
parcel, but she had not applied for transferable development rights that were
available. The Court held that she did
not need to do so. Leaving open the
question of whether TDRs might be taken into account in determining whether a
taking has occurred, their existence did not relate to the allowable uses of
the land of the claimant. Once that use
was established, the Court held the final decision ripeness requirement met.[17]
The reapplication process that McDonald contemplates creates a
dilemma. How many efforts are called
for? At some point the downsizing will render the project economically
unattractive, but if the developer gains approval of a lesser request, it
presumably waives any objection to losses based on the prior denials.
B. Palazzolo v. Rhode Island[18]
In the recent decision in Palazzolo v. Rhode Island,[19] the Court dealt with the futility exception. Anthony
Palazzolo acquired approximately 20 acres of land on the Rhode Island coast in
1959. Eighteen acres of the tract was
salt marsh and bordered a pond. Title was taken in the name of a corporation
that Palazzolo formed with others, but by 1960 Palazzolo was the sole shareholder.
The balance of roughly two acres was uplands. Palazzolo, through his
corporation, unsuccessfully sought permits to fill the wetlands portion in the
1960s. While the state had no regulations against filling wetlands, a dredge
permit was required. The state rejected
the first application for failure to provide the state with adequate
information, and, it rejected a second other for environmental reasons. In the 1970s, while Palazzolo made no
efforts at development, the state was busy enacting a coastal resources
management program that severely limited development of wetlands. In 1978,
Palazzolo’s corporation lost its charter for failure to pay state taxes, and
title to the land passed to Palazzolo.
Palazzolo’s next effort (but first
in his own name) to develop came in 1983 when he sought a permit to fill all 18
acres of wetlands. His application was denied. In 1985, he scaled down his
plans, asking to fill 11 acres to create a private beach club. Again, he was
denied permission. After an unsuccessful state court suit challenging the
propriety of the latter rejection on state administrative law grounds,
Palazzolo sued in state court claiming a taking under the Fifth Amendment,
seeking $3,150,000 in compensation. The state courts rejected Palazzolo’s
takings claim and he appealed to the Supreme Court.
As to ripeness, the state court,
applying Williamson County and McDonald, found the lawsuit was
premature since the extent of development allowed on Palazzolo’s property was
not known. Palazzolo had not, for
example, sought a permit for a less intensive development (say, filling only 5
acres). He also had not sought a permit to develop the uplands. Finally,
Palazzolo had not made specific application for permission to develop a 74 lot
subdivision, which was the basis of his claim for compensation.
The Supreme Court disagreed. Rhode
Island law was unequivocal, said Justice Kennedy: wetlands could not be filled.
State law did allow the coastal council to grant a “special exception” where
the proposed activity served a compelling public purpose. However, neither
residential use or the private beach club qualified for this exception. It was
true, the Court conceded, that where a landowner is denied approval of a
substantial, or “grandiose,” project, he must return to the permitting
authorities with a more modest proposal before his case is ripe. But that rule
did not apply to Palazzolo’s case; he had tried twice and failed. There was,
simply, nothing left for Palazzolo to ask of the state. Any further applications
would have been futile.
As to the failure to seek a permit
to build on the uplands, the Court noted that the state had conceded that “it
would be possible to build at least one single-family home” on the upland
portion.” The state argued that since it was possible to build “at least” one
home, other uses might be allowed. For the Court, however, there was no doubt.
The state was bound by its concession that the uplands might be developed with
one home and that, as such, the uplands had a value of $200,000.
There was no need for Palazzolo to
apply specifically for approval of a 74 lot subdivision even though that was
the basis of his compensation claim. The state worried that Palazzolo was
playing “hide the ball,” by seeking approval for relatively modest uses, only
to seek compensation for a much larger project. The council’s practice was to not consider proposals until the
applicant had satisfied all other state and local requirements. Here, that
would have meant zoning approval from the town and state approval of individual
sewage disposal systems. The Court said none of that mattered as far as
ripeness was concerned. As far as the coastal council was concerned, no fill
would be permitted for any purpose. Second, the state need not worry that Palazzolo
could claim damages based on the value of an intensive subdivision unless he
could show that the project would have been allowed under other existing,
legitimate land use restrictions.
C. Ripeness after Palazzolo
The ripeness requirement is considered
a curse by the development community, and some likely hoped that the Court
would seize upon Palazzolo to do away
with or significantly modify the rules in favor of challengers. That did not
happen. In fact, the Court reaffirmed Williamson
County and MacDonald. They seem
to be here to stay.
One aspect of the Court’s finding of
ripeness provides a modicum of hope to frustrated landowners’ and their lawyers
that the ripeness rules might be read in a more pro-landowner manner. The
record in Palazzolo contained
ambiguities as to what development permission the state might have granted
Palazzolo. In detailed examinations of the facts, Justice Kennedy for the
majority found that the landowner had done everything he should have done to ascertain what the state would permit him to do
with his land while Justice Ginsburg for the dissent found that the landowner had not done everything he could
have done to ascertain what the state would permit him to do with his land.
With a record that was unclear, the majority resolved the doubts in favor of
the landowner, while the dissent would have resolved them in favor of the
state.
This suggests that once the
landowner has made a reasonable application for development, the courts may put
the burden on the government to indicate possible development options. For
example, the majority observed that there was “no indication” by the state as
to whether a smaller area could be filled and that the state had not
“explain[ed] the reach” of the regulation.
Whether lower courts will notice this rather subtle message, if indeed
it is even that, and if they do recognize it, feel constrained to read the case
as moving the burden to the state remains to be seen. But, it is an argument
developers may now press.
The Court’s application of the
futility exception is not new,[20] but it is another wake up call to governments who place
themselves in a bind by enacting restrictions with little or no flexibility. If
there is simply, in the state’s mind, no way a certain type of land should ever
be developed in any fashion, the law should be firm and inflexible. Adoption of
such a law, however, makes it easier for a landowner to get the merits of her
takings claim heard since ripeness will be easy to establish. If it is conceivable that development might
be permitted on some land (i.e., if all wetlands are not the same), then
consideration should be given to allowing a meaningful variance or special
exception process to allow a landowner to ask whether her land qualifies for
the variance.
A classic example of how not to do
it is found in the South Carolina experience in the Lucas case, decided in 1992.[21] Lucas owned two beachfront lots on the Isle of Palms. The
state’s beachfront setback law, when applied to Lucas’ parcels, meant no
structure could be built on them. Lucas did not seek a variance from the state
because state law contained no variance process. The gist of the setback law was that nowhere on the coast of
South Carolina could the setback be relaxed.
Thus, there was no way the coastal council could look at a particular
lot or stretch of beach where the setback fell seaward of privately owned land
and conclude that building something might not be so bad. Thus, Lucas had a
ripe claim and won his case, since the effect of the setback was to deprive him
of any economically viable use of his land.
After buying Lucas’ lots, the state of South Carolina put the lots on
the market. It then sold them for less than it paid for them, permitting residential
development on them. One can imagine that had a variance process been available
at the outset, the landowner in Lucas
could have gotten a variance if, as seems to be the case with hindsight, the
council thought that erosion considerations would not be meaningfully advanced
by being applied to the lots.
Rhode lsland had a special exception
process but it was quite narrow. The only time permission to fill might be
granted was for a compelling public benefit, which was not the case with
Palazzolo’s proposals. This process is
much too narrow to be helpful in avoiding takings claims.
The Palazzolo opinion is an invitation to governments to build some
discretion into their inflexible processes. This can, and indeed must, be done
without reserving so much discretion that arbitrary decision making is allowed.
In addition to providing for some
degree of discretion in ruling on permit applications, governments might
explore the Court’s acknowledgment that states may require applicants to
exhaust state procedures and obtain permits from other state or local agencies
as conditions precedent to consideration of their application. For example, in
this case, the coastal council might have required Palazzolo to obtain local
zoning approval first. Sequencing requirements
may not, however, be unfair. Multiple agencies cannot all insist on being last.
State law should establish a priority system.
In sum Palazzolo’s
impact on ripeness is mixed. Perhaps a seed has been planted that might grow
into a burden shifting requirement where the regulator will be required to tell
a developer whose development application it has denied what the developer may
do. Even should that be the case, the Court’s reaffirmation of Williamson County and the suggestions
that states may develop their own exhaustion requirements are government
victories.
III. Forum Selection Under Williamson County and First English[22]
A. The Often Overlooked
Connection Between Williamson County
and First English
The second prong of Williamson County dealt with forum
selection. The landowner in that case sued in federal district court, without
having used the inverse condemnation process available in state court. Even assuming the restrictions were so
severe that they constituted a taking, the Court said the Constitution is not
violated unless compensation is not paid. Pursuit of such a remedy is required
where the state’s remedy is adequate.[23]
At the time of the Williamson County decision it was not
clear whether states had to provide a compensation remedy, but two years later,
in First English Evangelical Lutheran
Church v. County of Los Angeles,[24] the Court held that they did. Concluding that a mandatory
compensation remedy existed due to the self-executing nature of the Fifth
Amendment, First English, in effect,
deleted the qualifying “if” in Williamson
County’s holding that “if a state has an adequate process, compensation
must be sought from the state.” It was
no longer a choice. States had to grant such relief. While a few have disputed or not understood this, it is beyond
question. As the Court reconfirmed in City
of Monterey v. Del Monte Dunes at Monterey, Ltd., “when the government
condemns property for public use, it provides the landowner a forum for seeking
just compensation, as is required by the Constitution.”[25]
The combined rule of Williamson County/First English is that
a landowner with a takings claim has an action for compensation conferred
directly by the Constitution, and that action can and must be brought in state
court. When one adds to this the law of preclusion and other judicial
federalism doctrines such as the Rooker-Feldman
doctrine, the claim and issues that must be litigated in state court cannot be
attacked collaterally in a subsequent action in federal district court. With very few exceptions, if federal review
is to occur, it must come by way of direct review by the Supreme Court, as it
did in other recent takngs cases: First
English, Nollan, Lucas, Dolan, Palazzolo, Penn
Central, Loretto and Agins.[26]
The Williamson County/First English message is not well understood.
Too often the two cases are viewed separately. And, often, though usually in
dicta, the preclusive effects of Williamson
County/First English are overlooked. The Seventh Circuit, for example, has
vigorously enforced the Williamson
County/First English compensation requirement, yet, it still tells property
owners in gratuitous dicta as it sends them to state court, to come back if
they are unhappy with the result.[27] A moment’s reflection on preclusion should tell the court
that it ought not be so gracious. Such an invitation, perhaps understandable in
the immediate aftermath of Williamson
County, is no longer responsible with a substantial body of post-Williamson County/First English case law
holding that claim and issue preclusion bar relitigation.[28]
B. Nature of the Cause of Action: “claims for just
compensation are grounded in the Fifth Amendment”[29]
In exploring the procedural
consequences of Williamson County/First
English, an initial inquiry must be made into the nature of the cause of
action that is to be pursued in state court. Is it a right to compensation
arising under the Fifth Amendment? Or, is it one arising under state law? It
matters for at least two reasons. If the cause of action asserts a federal right,
then claim preclusion applies to an attempt to relitigate in federal court. If
the claim arises under state law, then the federal claim will not be litigated
in state court, and claim preclusion will not apply in federal court. Issue
preclusion will apply, but issue preclusion generally only bars matters
actually litigated, not matters that could have been litigated.[30] A second consequence that flows from the federal versus
state characterization is a potential affect on a federal court’s exercise of diversity,
supplemental and removal jurisdiction.
A number of courts have assumed, and
in some cases affirmatively decided,[31] that the cause of action to be pursued in state court is
state-law based. I think this is wrong.
This assumption often is reflected by unexamined comparisons between
“takings claims” and “inverse condemnation” claims as if the former represents
the Fifth Amendment claim and the latter represents a state law claim. There
is, however, no inherent difference between them. Inverse condemnation simply refers to the manner in which a
property owner seeks compensation for a taking. Thus, loose references to
landowners bringing “inverse condemnation actions” in state court do not,
standing alone, tell whether the source of the action is federal or state law.
When a landowner approaches the
state court to demand “just compensation” on the basis that the state has
“taken” property, it is the Fifth Amendment right that is being asserted. The
state controls the process, and may additionally provide its own substantive
protection, but the “just compensation” claim, as First English says, is “grounded in the Fifth Amendment.” Since the
Fifth Amendment is self-executing, reliance on state law is unnecessary.
Likewise, federal statutory support is not necessary to support a Fifth
Amendment takings claim. Other constitutional claims must be filed pursuant to
42 U.S.C. § 1983, or rely on the Court finding an implied direct cause of
action under the constitution. A takings claim, however, is given an express
cause of action. That is what self-executing means. Advantages to using § 1983
exist, such as the availability of attorney’s fees, but resort to § 1983 is not
necessary.
Palazzolo
v. Rhode Island[32] demonstrates this. After being denied development
permission, Palazzolo “filed an inverse condemnation action in Rhode Island
Superior Court asserting that the state’s wetland regulations . . . had taken
the property without compensation in violation of the Fifth and Fourteenth
Amendments.”[33] The state courts denied Palazzolo’s claims based on the
Fifth Amendment and the United States Supreme Court, as has been noted,
reversed on Fifth Amendment grounds. So much for the idea that one does not
pursue federal rights in state court.
C. Preclusive Consequences of
State Court Action
The takings claim is unique in two
respects, and this uniqueness produces a good news/bad news irony for the
property owner. The good news: it is the only constitutional right that is
awarded an express self-executing compensation remedy. The bad news: the final step to creating the
cause of action is a step litigating the cause of action. What makes some
uncomfortable about this is that the benefit of the mandatory compensation
remedy means that an unsuccessful assertion of the Fifth Amendment right to
compensation in state court precludes a federal district court from ever
hearing the claim. A state court’s refusal to find a taking might be wrong on
the merits, but the only test of that is by direct appeal.
If, as is usually the case, no
avoidance technique enables the property owner to avoid litigating the takings
claim in state court,[34] that ends the matter. Where the plaintiff, unhappy with
what the state court has done, seeks to obtain review by the federal district
court, she will find one of two bars: the Rooker-Feldman
doctrine, or, if that does not apply, claim or issue preclusion.
(1) Rooker-Feldman Doctrine
Federal district courts are barred
by the Rooker-Feldman doctrine[35] from “entertaining a proceeding to reverse or modify”[36] a state court judgment or from hearing issues “inextricably
intertwined”[37] with a state court decision. The sole avenue of relief
available to a party who has lost in state court and wishes review of a federal
question that was or could have been presented in state court is to appeal to
the Supreme Court of the United States. If that route is not taken, the state
court judgment stands.
While the doctrine lay dormant for
years, it has emerged in recent years as a popular defense, being used over 500
times by lower federal courts in the 1990s to dismiss cases for lack of
jurisdiction.[38] The basis of Rooker-Feldman
is 28 U.S.C. §1257, which vests appellate jurisdiction solely in the Supreme
Court.[39] The rationale is
that if a “federal challenge succeeds only to the extent that the state court
wrongly decided the issue, . . . [or] if the federal action would effectively
reverse the state court decision,”[40] the district court would be exercising appellate
review. As the Court said in Feldman, “this it may not do.”[41]
(a) Compared to Preclusion and
Abstention
Rooker-Feldman,
while similar to the preclusion doctrines in that it prevents relitigation, Rooker-Feldman exists for a reason
different from the preclusion doctrines. As Professor Sherry says, Ares
judicata is about parties; Rooker-Feldman
is about courts.[42] Preclusion rules
exist primarily to protect persons from being exposed to repetitious litigation
by those they have defeated in prior lawsuits. Rooker-Feldman protects the integrity of the state courts by
prohibiting federal district courts from intruding on state courts. While
preclusion rules limit all courts (within a state, between states, and between
state and federal systems) from second guessing prior court decisions, Rooker-Feldman only acts to curtail
federal district court jurisdiction.
Preclusion, under the full faith and credit statute, requires federal
courts to look to state law. Rooker-Feldman
is federal law.
Rooker-Feldman goes to the subject matter jurisdiction of the district
court and, thus, Amay be raised at any time by either party or sua sponte by
the court . . . [and] in that respect, it is quite unlike the affirmative
defenses of collateral estoppel or res judicata.@[43] The Rooker-Feldman determination of jurisdiction
based on federal law comes first;[44] and, if jurisdiction exists, res judicata or collateral
estoppel may follow as an affirmative defense.[45] What Rooker-Feldman
does not bar, preclusion doctrines may.[46]
Rooker-Feldman fills some of the gaps in preclusion. Professor Sherry
explores these gaps in detail in her article,[47] but, a short list includes the fact that preclusion does
not apply to pending suits, Rooker-Feldman
does. With preclusion issues, federal courts apply state law, and preclusion
rules vary among the states and are notoriously complex, with numerous exceptions. Rooker-Feldman is a rule of federal law, theoretically unvarying
among the federal courts, though still dependent on state law to some degee.[48]
A recent Sixth Circuit case, Anderson v. Charter Township of Ypsilanti,[49] actually speaks of Rooker-Feldman
abstention, but the doctrine does differ from abstention.[50] The most frequently invoked rule of abstention, for
example, Younger v. Harris,[51] requires that the state proceeding be pending and that the
matter involve important state interests. Neither requirement applies to Rooker-Feldman.
(b) Applications of Rooker-Feldman in Land Use Cases[52]
Rooker-Feldman
requires dismissal of a claim that is Ainextricably intertwined@ with a claim
already adjudicated in state court. The test is whether the relief requested in
the federal action, if granted, would effectively void the state judgment.[53] It applies to issues litigated and issues that could have
been litigated in state court.
Anderson
v. Charter Township of Ypsilanti,[54] exemplifies Rooker-Feldman=s
use in takings litigation.[55] Plaintiff was unsuccessful in obtaining a rezoning of land
from light industrial to multi-family use. Plaintiff sued in state court,
alleging a taking and a due process violation under the federal and state
constitutions. The township removed the case to federal court. That court
remanded the state law claims and stayed proceedings on the federal claims (a
takings claim and apparently substantive and procedural due process claims).
When the state court ruled against plaintiff on the merits of his takings
claim, the plaintiff filed a motion in federal court to lift the stay, and he
appealed to the state intermediate appellate court. While the state appeal was
still pending, the federal district dismissed the takings claims for lack of
subject matter jurisdiction on the basis Rooker-
Feldman.
The Sixth Circuit affirmed, finding
that the issues the district court would have been called upon to decide were Ainextricably
intertwined@ with the state court=s ruling. Examining the state courts’ various
rulings at the trial and appellate levels, the court concluded that Michigan
and federal takings law were essentially the same. While the state trial court
had limited its review to categorical takings doctrine, the state appellate
court had covered non-categorical takings law as well.[56] Thus, after a thorough discussion of the grounds of the
Michigan decisions, it was clear to the Sixth Circuit that consideration of a
Fifth Amendment claim by the district court would involve a prohibited review
of what the Michigan courts had done.
Another case is Hill v. Town of
Conway.[57] There the Second Circuit upheld the dismissal of a takings
claim on the basis of Rooker-Feldman.
The landowners had filed a subdivision plat that depicted a road. After the
project was built, the town maintained the road. Then, the town filed a
declaration of taking of the road with the state Board of Tax and Land Appeals.
The Board allowed the take but awarded no damages. The landowners filed two
state lawsuits. One challenged the propriety of the taking. The other sought a
reassessment of the damages. The landowners lost both cases. In the first case,
the court held that the filing of the plat constituted a voluntary dedication
of the road to the public and, alternatively, that the maintenance performed on
the road resulted in dedication. The state supreme court summarily affirmed the
trial court.
In the second case as to damages,
the trial court held that the plaintiffs were barred from relitigating the
issue of the first case, whether a dedication had occurred. The court then
found that damages were not due to one who dedicated a road. The state court
rejected landowners= reliance on Dolan v.
City of Tigard,[58] finding that dedication in Dolan was not voluntary.[59] The state supreme court refused review.
Rather than seeking United States
Supreme Court review of the state court judgment, landowners commenced suit in
federal district court seeking compensation for the taking of the road on the
basis of Dolan. Since the relief
requested in the federal action, if granted, would effectively void the state
judgment, the Second Circuit held that the district court was barred from
hearing the claim for compensation under the doctrine of Rooker-Feldman.[60]
Rooker-Feldman does not apply if the federal plaintiff lacked an
opportunity to raise the federal issue in state court. Thus, in Agripost, Inc.
v. Miami-Dade County,[61] the county revoked a waste disposal facility=s permit due
to neighbor complaints about the Avile stench@ and Ablack, thick glue-like mold@
that the plant emitted. The permit revocation was appealed to a three-judge
panel of the state circuit court, which affirmed based on findings that
Agripost had breached its permit conditions. The state court of appeal refused
review. Then Agripost filed a takings claim in federal court. The county sought
dismissal on the basis of Rooker-Feldman,
or in the alternative , on preclusion grounds. The district court rejected the
applicability of either, and on its own initiative, dismissed the case as
unripe since Agripost had not sought compensation from the state court.
The county appealed to the Eleventh
Circuit,[62] which affirmed the district court. Rooker-Feldman did not apply since the plaintiff could not have
raised the takings issue in the state circuit court, which, due to the
procedural posture in which the case came to it, lacked authority to decide
that issue. The state circuit court was only to decide the validity of the
permit revocation. While the state court decided the revocation was proper
under state law, it was still possible, noted the Eleventh Circuit, that the
revocation had rendered the plaintiff=s land worthless and might therefore be a
taking. But, that issue had not been before the state court. In Rooker-Feldman terms, the federal court
is barred from hearing a matter where its judgment would contradict a prior
state court ruling. Here, a finding of
no economic value would not be at odds with what the state court had found.
As the Eleventh Circuit opinion in Agripost indicates, if the takings issue
was not, or could not have been, litigated in state court, the takings claim
must still be dismissed by the federal court, but on Williamson County’s state compensation rule rather than Rooker- Feldman grounds. That, however,
does not mean that the landowner can return to federal court after the
litigation takes place in state court. At that point, a return to federal court
will be barred by either Rooker-Feldman
or preclusion.
(2) Res Judicata/Collateral
Estoppel (Claim and Issue Preclusion)
Once a property owner has completed
prong two, the law of res judicata will usually preclude a Fifth Amendment
claim from being pursued in federal court.[63] Adjudication of the claim in state court bars a subsequent
suit in federal court under the full faith and credit statute, 28 U.S.C. §
1738. Collateral attack of the state
court judgment is not available in federal district court. A property owner who is dissatisfied with
the results obtained from the state court is limited to appealing directly to
the United States Supreme Court.[64]
Most courts have addressed the issue
as one of claim preclusion, finding the state court’s adjudication of the
federal takings claim to bar relitigation.[65] If a court takes
the position like the Ninth Circuit in Dodd,
discussed below,[66] that the state claim must be litigated first in state
court, making the federal claim cognizable in district court, the property owner
will be limited by issue preclusion. Typically, the same issues that the
property owner asserts under the federal claim are the same as those asserted
under the state claim, in which case the bar is complete.
D. Possible Exceptions Allowing a Suit in
Federal District Court
There are several possible
exceptions to consider for the plaintiff who would prefer to be in federal
court. I stress these are possible
options; they may never, and at best will rarely, work.
(1)
Sue in federal court, claiming resort to the state courts would be futile.
(2)
Sue in state court and give notice to the state court of an intent to reserve
the right to go to federal court at the end of the state litigation.
(3)
Where there is diverse citizenship, a federal district court may hear a state
takings claim and perhaps a federal one as well.
(4)
For the property owner who has another claim over which a federal district
court has jurisdiction, sue on that claim and append a state takings claim,
asking the court to exercise supplemental jurisdiction over the latter.
(5)
As a variant of number four, append the otherwise incomplete federal takings
claim to the other federal claim.
(6)
Finally, and not of the plaintiff’s choosing but perhaps to her liking, the plaintiff
who begins as she should in state court may wind up in federal court by virtue
of government removal.
(1) Futility of Using State Court
The burden is on the property owner
to establish the inadequacy of the state's compensation remedy, and it is a
difficult burden to carry.[67] Uncertainty, for
example, does not equal inadequacy.[68] Also, if the property owner allows the state statute of
limitations to run, she forfeits any right to seek compensation in federal
court.[69] If the property owner's state action is dismissed with
leave to amend, and the property owner fails to amend, no federal suit will
lie.[70]
There are cases where the state
remedy is inadequate, but they are few. In Neumont v. Monroe County,[71] the federal court found the state’s obstruction of
plaintiff’s pursuit of relief in state court to render the state compensation
requirement futile. The county allegedly made changes to the ordinance and
agreed not to enforce the ordinance to moot the state suit.
In rare instances, prong two futility
can be established by proving that the state courts have rejected takings
claims that are on all fours with the challenger's case. Since takings claims are usually highly ad
hoc affairs, this will not often occur,[72] but it does happen.
In Naegele Outdoor Advertising, Inc. v. City of Durham,[73] a challenge to a five- and-one-half year billboard
amortization ordinance was deemed ripe in federal court without pursuit of a
suit in state court since the North Carolina state courts had, on several
occasions, upheld the same type of amortization ordinance.[74] The federal court concluded that a five and one half year
sign amortization provision would not be viewed as a taking by the North
Carolina courts and that it would be pointless to ask the state court for relief.
The Ninth Circuit has made a similar finding with respect to certain rent
control statutes as they have been construed in California state courts.[75]
Unavailability must be clear. It is
not enough to point to an ambiguous intermediate state court opinion.[76] In SGB Financial
Services, Inc. v. Consolidated City of Indianapolis-Marion County,[77] the court rejected the argument that the state courts would
not grant relief in a condemnation blight case. The federal plaintiff could
only point to a state intermediate appellate court opinion that was arguably
distinguishable.
Another instance of unavailability
may occur where the government defendant removes a takings case from state
court. I explore this idea, which is supported by common sense if not by prevailing
law, below.
(2) Reservation à la England
Several courts have wondered[78] whether, or assumed that,[79] state court plaintiffs may reserve the right to litigate
their Fifth Amendment takings claims in federal court under the doctrine of England v. Louisiana State Board of Medical
Examiners. In England, the Court
held that a party who, having properly invoked federal court jurisdiction, is
compelled by the federal court’s exercise of Pullman abstention to litigate in state court can reserve her right
to return to federal court for consideration of federal issues after the
termination of the state proceedings.
England
is not directly applicable since it involves a suit properly commenced in
federal court. A taking claimant cannot do that, if he she does so will have
her case dismissed for lack of jurisdiction for failure to pursue state
remedies. Since the district court lacks jurisdiction over the claim, there is
nothing to reserve. By extension, England might be applied where the landowner
brings suit in state court, and, at the outset of the litigation, files a
notice with the state court of an intent to reserve the right to have the
federal takings issue heard in federal court. Whether England will or should be expanded to cover this situation is open
question.
There is, to be sure, a similarity
of involuntariness in the England
abstention situation and the takings case. Like an England plaintiff, a takings plaintiff is sent to state court
involuntarily and will be denied a federal forum by the move. The takings issue
is different, however, since the matter submitted to state court is not an
issue of state law the resolution of which might avoid a federal ruling. It is a federal law issue, the Fifth Amendment,
that the state court decides.[80] The England rule
exists to protect the purpose of Pullman
abstention to avoid federal constitutional rulings, but Williamson County/First English demand that a state court make a
federal constitutional ruling.
In Fields v. Sarasota Manatee Airport Authority,[81] the Eleventh Circuit, with some reluctance, said that an England reservation can be used in a
regulatory takings case.[82] The court conceded that England
was not directly applicable since a takings case cannot be brought in federal
court in the first instance, but the court found that precedent within the
circuit compelled it to recognize a reservation made in a case initiated in
state court.[83] This was a misreading of England, said the court, but one that it found too late to revisit.[84] Fields went on to
find that despite the strict inapplicability of England, allowing a reservation was proper under post-England holdings in Allen v. McCurry[85] and Migra v. Warren
City School District Board of Education.[86]
In Anderson v. Charter Township of Ypsilanti,[87] the Sixth Circuit found that a landowner waived an assumed
England reservation. In Anderson, the
property owner had sued in state court and been removed to federal court. The
federal district court partially remanded the case, sending the state claims
back and keeping the federal claims.[88] In remanding the district court judge said that the “stay
was intended to preserve `the defendant [township’s] right to have a federal
court determine the federal issue.’”[89]
Even assuming an England reservation is proper in theory,
the Anderson landowner failed to
reserve his assumed rights when he got back to state court. The Sixth Circuit pointed out that there are
two ways to make one’s reservation. First, and preferably, one makes an
explicit statement to the state court of a his intent to return to federal
court. Failing that, he may still return “`unless it clearly appears that he
voluntarily did more than . . . required and fully litigated his federal claim
in state court.’”[90] Anderson made no explicit reservation in state court, but
argued that the federal district court’s statement quoted above “preserving the
defendant’s right” to a federal forum operated as his state court reservation.
The Sixth Circuit did not accept that since not only did the above statement
refer to the defendant not the plaintiff, but it was made in federal court
rather than, as required, in state court. Secondly, the court found that
Anderson had fully litigated his federal claim in state court by presenting
takings arguments which included reliance on federal cases.
The effort to expand the England reservation principle to takings
claims may not be worth the trouble since issue preclusion will apply to
prevent relitigation in federal court. Dodd
v. Hood River County[91] left open the propriety of an England reservation question, but found the parties and the state
court had agreed to allow the property owners to assert their takings claim in
federal court after state court adjudication of a state takings claim.[92] The state court expressly ruled that it was considering
only Oregon law in finding no taking of the plaintiffs’ property. Since there
was an agreement allowing the plaintiffs to split their claims, the court held
the plaintiffs were not subject to claim preclusion when they sued in federal
court. The court went on to hold, however, that issue preclusion prevented the
Dodds from relitigating issues that had been decided adversely to them by the
state court.
(3) Diversity Jurisdiction
Diversity jurisdiction represents
another avenue to federal court. If diverse citizenship exists between the
property owner and the city or county agency,[93] then a federal district court has jurisdiction to hear any
claim the state court could hear.[94]
In County of Allegheny v. Frank Mashuda Co.,[95] the county appropriated land allegedly to use in expanding
the Pittsburgh airport. Under state practice, a board of assessors was
appointed to assess compensation for the taking. The (former) land owners
discovered that the land taken from them had been leased to a private party.
Claiming this transfer violated Pennsylvania law, which prohibited takings for
private use, the landowners, who were citizens of Wisconsin, sued in federal
district court, seeking ouster of the private lessee. The Supreme Court upheld
the exercise of diversity jurisdiction over the state law claim. Since the
petitioners could have filed such an action in state court, they were entitled,
by virtue of their non-citizenship, to ask a federal court to act as would a
state court and apply Pennsylvania law with respect to private takings.
Following this Supreme Court lead,[96] several lower federal courts in recent years have ruled on
property owners’ state law regulatory takings claims when their jurisdiction
was founded on diversity.[97] In such a case, the
federal district court must act as a state court would act, and this presents
no problem insofar as the takings claim is based on state law. Traditional rules of claim and issue
preclusion will bar a subsequent federal trial on the federal claim.[98]
In the recent Vulcan Materials Co. v. City of Tehuacana,[99] the Fifth Circuit recognized this exercise of diversity
jurisdiction. Denied the ability to mine by the city, the property owner sued
in federal district on virtually every conceivable ground: the Fifth Amendment,
the state constitutional counterpart to the Fifth Amendment, substantive and
procedural due process as well as equal protection under the Fourteenth
Amendment, state due process and equal protection claims, and a declaratory
judgment on other state law grounds. The plaintiff asserted federal question
jurisdiction over the federal claims and supplemental jurisdiction and
diversity jurisdiction over the state law claims. The district court dismissed the federal takings claim as unripe
and dismissed the other federal claims for failure to state a claim. It
declined to exercise jurisdiction over the state law claims.
Vulcan appealed the dismissal of its
state law takings claim. The Fifth Circuit held that the district court should
not have dismissed this claim inasmuch as diversity existed between the
plaintiff and defendant.[100] State law takings claims are cognizable in federal court
under diversity, said the court. Once the trial is held, the court noted that standard
rules of preclusion apply to prevent rehearing the claim as a federal takings
claim.[101]
Can a federal court, sitting as a
state court by diversity jurisdiction, hear a federal takings claim? This occurred in William C. Haas & Co., Inc. v. City and County of San Francisco,[102] where the Ninth Circuit heard a Kansas City developer’s
federal takings claim based on diversity jurisdiction. If you find this odd and
suspect that the plaintiff really brought a claim based on California law, or
that jurisdiction, in this pre-Williamson
County/First English case, was based on the existence of a separate,
independent federal question, the opening statement of the court should satisfy
you:
“Haas, a Kansas City developer “brought this diversity action against the . . . City claiming
that the City's rezoning of its property . . . so far diminished the value of
its property as to constitute a taking for which it is entitled to just
compensation protected by the Fourteenth Amendment.”[103]
The
court proceeded to rule against the plaintiff developer on the merits. Though
it may seem peculiar that a federal court could hear a federal claim in
diversity when it could not hear the same claim under its federal question
jurisdiction due to the Williamson County/First
English rule, the exercise of such jurisdiction comports with the notion
that, in diversity, federal courts should act like state courts would act, and
in a regulatory takings case based on the Fifth Amendment, the state court
would hear the case.
Assuming existence of the power to
hear the claim, a question of comity remains as to whether the federal district
court in diversity must hear the takings claim, be it state or federal. Here, County of Allegheny v. Mashuda is
instructive though not determinative. The Mashuda
Court rejected the idea that the district court should abstain on grounds of
comity from applying what, in that case, was settled state law. A different
matter presents itself if state law is unsettled. But, if the claim is a federal one, as in Haas, then no deference to the state courts need be
considered.
With respect to state law eminent
domain issues, the Mashuda Court
found “no hazard of friction in federal-state relations.”[104] Federal courts were accustomed to dealing with such issues,
said the Court. However, where the issue is the reach of the police power in
controlling land use, greater comity considerations may arise. In contrast to
the relatively straightforward questions of compensation that typically arise
in eminent domain proceedings, the issues in regulatory takings cases might
justify abstention by a federal district court.
(4) Supplemental Jurisdiction:
Appending a State Takings Claim
If a Fifth Amendment claim is filed
in federal court where the landowner has not sought compensation in state
court, the action is dismissed for lack of subject matter jurisdiction. An
equal protection or substantive due process claim, however, can be filed in
federal court more easily than a takings claim. Most courts apply Williamson County’s final decision
requirement to equal protection and due process claims, but, quite properly, do
not require the plaintiff to pursue state judicial relief under Williamson County’s second prong. Thus,
the property owner might file an equal protection claim in federal district
court and append to it a takings claim. This might be a state takings claim, or
possibly the federal takings claim. While there is a fair amount of support for
the former, there is but slight support for the latter. Using supplemental
jurisdiction as an end run around the inevitable Williamson County dismissal of a Fifth Amendment claim “turns Williamson County on its head,”[105] as one court charged, and, since courts have discretion in
exercising supplemental jurisdiction, it may not be successful.
Title 28 U.S.C.A. § 1367(a) provides
that "the district courts shall have supplemental jurisdiction over all
other claims that are so related to claims in the action within such original
jurisdiction that they form part of the same case or controversy under Article
III of the United States Constitution." Thus, a property owner who secures
federal district court jurisdiction by asserting a due process or equal
protection claim may append a state takings claim, which the court may hear
through its exercise of supplemental jurisdiction.[106]
Hearing the claim is not compulsory.
Under § 1367 (c), a federal court may decline to exercise such jurisdiction if
one or more of the following circumstances exists: “(1) the claim raises a novel
or complex issue of state law, (2) the claim substantially predominates over
the claim or claims over which the district court has original
jurisdiction, (3) the district court
has dismissed the claims over which it has original jurisdiction, or (4) in exceptional circumstances, there are
other compelling reasons for declining jurisdiction.”[107] Normally, at least one, and perhaps several, of these will
apply to Williamson County end run
attempts.
Subsection (1) may arise where the
takings issue presented has not been adjudicated by the state courts under the
state constitution. It is not unusual for state courts to rule on takings
claims without being clear whether they are applying the state or federal
takings clauses, or both. Where the federal court finds the issue presented has
not been decided by the state court under the state constitution, it may
decline jurisdiction.
Subsection (2) may exist since the
equal protection and due process claims that are asserted are often
insubstantial, stretching notions of the Fourteenth Amendment with no realistic
opportunity of success. To use this end run a plaintiff who has to scrounge for
a claim to leverage the takings claim is out of luck. If the only serious issue
is the state takings claim, the federal court should let the state court decide
it.
The leveraging hook of equal
protection or due process may be found so wanting that it is dismissed early
on, either for failure to state a claim or on summary judgment. Even though the
court has had the claim for some deliberations, dismissal of the state takings
claim is nonetheless proper under Subsection (3).
The potential expansion of property
owner equal protection claims suggested by Village
of Willowbrook v. Olech[108] may make it less likely that subsections (2) or (3) will
apply. Olech sued the Village of
Willowbrook seeking damages for the village’s alleged denial of her right to
equal protection. The essence of her complaint was that when she asked the
village to hook her house to the public water line, the village demanded from
her a 33' easement. Others similarly situated had only been asked to grant a
15' easement. The reason for the disparate treatment, she alleged, was that she
had successfully sued the village earlier over stormwater damage, and that the
village, seeking revenge, was motivated by ill will.
The Court held that Olech stated an
equal protection claim. It mattered not that she was a “class of one,” or that
she asserted no fundamental right or that she claimed no membership in a suspect
class. It is sufficient that she “alleges that she has been intentionally
treated differently from others similarly situated and that there is no
rational basis for the difference in treatment.”[109] Though Olech had alleged that the village was motivated by
ill will, the Court said the village’s subjective motivation did not matter.
Her complaint was sufficient without such allegation.[110] The possibility thus exists that equal protection claims
can now more easily survive a motion to dismiss, and perhaps survive a summary
judgment motion as well.[111] To the extent that
this occurs, it is more likely that appended takings claims will not be thrown
out under § 1367 (c) (2) and (3).
The fourth category of exceptional
circumstances may apply to all takings claims under the rationale that local
control over land use is a per se compelling reason. Even if not a per se rule,
on an ad hoc basis, takings claims often present strong cases for deferral.[112]
While most reported cases involve
district courts that have refused to exercise supplemental jurisdiction,[113] there are cases to the contrary. In Picard v. Bay Area Regional Transit District,[114] alleging lack of ripeness, the plaintiff sought remand to
the state court of its federal due process, equal protection, and takings
claims and its state takings claim. The federal district court dismissed the
federal takings claim based on Williamson
County’s prong two. The court then found the due process and equal
protection claims ripe. The court, however, refused to remand a state inverse
condemnation claim to state court. In an ironic twist, the plaintiffs who
wanted to be back in state court resorted to the argument that their due
process and equal protection claims were too “insubstantial” to justify
retention of their state takings claim. Disagreeing, and finding it important
to keep the related claims in one forum, the court declined to defer to the
state’s interest in applying its own law of takings to the case.[115]
(5) Supplemental Jurisdiction:
Appending an “Otherwise Incomplete” Federal Takings Claim
If the property owner sues in
federal court on equal protection or substantive due process grounds and
appends an otherwise[116] incomplete federal takings claim, there are legions of
cases keeping the former and dismissing the latter for failure to pursue state
remedies.[117] But, is it necessary and proper to do this where the
failure of the property owner to seek state judicial relief is the only reason
the federal court lacks original jurisdiction over the takings claim?[118] If the federal district court has jurisdiction over the
equal protection or due process claim, why should it not hear a takings claim,
which arises out the same facts, particularly when it can hear such a federal
takings claim upon removal and hear a state takings claim by supplemental
jurisdiction?
Assuming the claimant has obtained a
final decision from the local government, her takings claim is ripe (in any
proper sense of the term) for adjudication, and the question is simply which
court should decide it. “The state court,” one might think, is the only
response that Williamson County/First
English allow. That is true if the takings claim is the claim on which
federal jurisdiction depends. But, if the federal court has jurisdiction on
another basis, it may be more efficient for the federal court to hear the
takings claim as well. Most importantly, the supplemental jurisdiction statute,
which provides that "the district courts shall have supplemental
jurisdiction over all other claims that are so related to claims in the action
within such original jurisdiction that they form part of the same case or
controversy,”[119] allows it on its face.
If the power exists, comity
considerations may often suggest the federal court not exercise it. Addressing
the efficiency v. comity question though, is, I think, a better way to resolve
the matter than to deny that the power exists. I know of no direct holding
accepting supplemental jurisdiction over a federal takings claim,[120] but the theory can explain the results of some of the
removal cases discussed below where the federal courts reach the merits of
federal takings claims.
(6) Removal
It is not always the property owner
who prefers a federal forum. Municipalities do at times, and when that is so,
they try to achieve it by removal. Cases are removable from state court under
28 U.S.C. ' 1441, where they are within the original jurisdiction of the
federal court.[121] Three situations may arise. (1) If a property owner files a
Fifth Amendment takings claim in state court, conventional wisdom says it is
not removable since the case is not within the original jurisdiction of the
court under prong two of Williamson
County.[122] A competing view is
that the act of removal establishes the unavailability of a state remedy,
conferring original jurisdiction on the court. (2) The second situation is
where the plaintiff brings a federal and/or state takings claim and couples
with it other federal claims such as equal protection or due process. Here,
removal may be proper, and supplemental jurisdiction may exist. (3) If the
plaintiff files in state court solely alleging a state law claim for
compensation, the case is not removable.
(a) Consequences of Government
Removal
In a number of recent cases, the
defendant government entity removes. It then seeks dismissal on either the
merits or on jurisdictional grounds. The plaintiff may choose to seek remand or
to stay and fight.
McDonald’s Corp. v. City of Norton
Shores,[123] is typical. McDonald=s sought approval of a site plan for a
restaurant with a drive-thru window. While the city=s site plan review
procedures did not expressly include consideration of traffic flow, the plan
was rejected due to traffic concerns. The denial of the site plan was only one
of three denials by the city in the past five years, and other fast food
restaurants with drive-in windows had been permitted in the vicinity.
McDonald=s sued in state court
alleging, in addition to state law claims, a taking, and denials of substantive
due process and equal protection. The city removed and moved for summary
judgment. The court found against McDonald=s on the merits of its substantive
due process and equal protection claims.[124]
As to the takings claim, the
plaintiff had not met the state compensation requirement of Williamson County, so the court
dismissed the case. That left McDonald=s back where it started, to sue again in
state court alleging a taking. That result accords with conventional wisdom.[125] However, the court
might have kept the federal takings claim, treating the defendant’s removal as
conclusive evidence that the state’s procedure had proven futile in this case.
The court alternatively might have considered exercising supplemental
jurisdiction over the federal takings claim. This still might have led to dismissal,
since the exercise of supplemental jurisdiction is discretionary, but, at
least, the propriety of proceeding based on efficiency and equity would have
been considered.
In Seiler v. Charter Township of Northville,[126] the city conditioned subdivision approval on construction
of a bicycle path and bridge for public use. The landowner sued in state court
alleging an as applied Fifth Amendment takings claim, as applied due process
and equal protection claims, a facial claim that the standards and procedures
used by the township were unconstitutional without specifying the clause of the
constitution that was allegedly violated, and a state inverse condemnation
claim. The city removed, and the district court dismissed the as applied
takings claim and equal protection and due process claims for failure to meet
either prong of Williamson County.
As to the takings claim, the
landowner argued that he had sued in state court only to have the township
remove and that the court ought not dismiss the takings claim because he would
suffer delay caused by the defendant’s removal. The court sympathized, but said
removal was a right separate from ripeness. The township had a right to remove
and any delay suffered by the plaintiff was the plaintiff=s fault: namely, the
“plaintiff=s decision to file unripe federal claims as part of his state court
inverse condemnation action.”[127] The plaintiff, thus, is back where he started.
Rather than arguing delay as a
reason to overcome the ripeness objection, Seiler might have suggested that the
township=s removal deprived him of a state remedy. He had tried to seek
compensation in the state courts, but the defendant would not allow him to
proceed. The unavailability of a state remedy is a specific basis for the
exercise of original jurisdiction by a federal district court under Williamson County.
The Seiler court may well be correct in saying, as a general
proposition, that “the right to remove federal claims is separate and distinct
from the question of whether those claims are ripe for adjudication,” but it is
wrong to apply that to Fifth Amendment takings claims that are indisputably
ripe for judicial action and the only question is which court, state or
federal, will decide them.[128]
(b) College of Surgeons and Support for the Exercise of Jurisdiction
Upon Removal
International College of Surgeons v.
City of Chicago,[129] brought attention to the practice and propriety of
government defendants removing takings claim to federal court. The holding of College of Surgeons did not address the
propriety of government removal, but the district court’s handling of the
federal takings claim opens up the possibility of district court jurisdiction
over takings claims in removal situations. Also, the power the Court confers on district courts to review state
administrative findings speaks to the broader federalism issue of whether
district courts should use the power they have to hear claims via supplemental
jurisdiction.
The Surgeons filed suit in Illinois
state court complaining on various federal constitutional and state law grounds
about the city’s historic landmarking of their property. The city removed the
case to federal court on the basis of supposed federal question jurisdiction.
The federal claims included equal protection and due process claims, and a
takings claim. In 1992, the district court dismissed “some of the
constitutional claims.”[130] Then, in 1995, the district court ruled on the remaining
federal and state claims, finding in the city’s favor on all counts. The
Seventh Circuit reversed in part, holding that it was error for the district
court to exercise supplemental jurisdiction over the state law claims that
called for deferential, on-the-record review of state administrative findings.
The Supreme Court reversed the circuit court.
The Supreme Court held that when a
case is properly removed on the basis of a federal question presented by the
plaintiff to the state court, a district court has the power to exercise
supplemental jurisdiction over state claims including deferential,
on-the-record review of state administrative findings. The Supreme Court did
not discuss the federal claims that justified removal.
The district court had “dismissed
with prejudice several of plaintiffs' equal protection and due process claims,
including the claim that the Landmarks Ordinance effected an unconstitutional
`taking’ of plaintiffs' property.”[131] With respect to
plaintiffs' federal takings challenge, the district court, relying on Penn Central,[132] found that the landmarks ordinance did "`not affect
plaintiffs' ability to continue using the subject property as a corporate
headquarters or museum,’" and hence was not a taking.
Conventional wisdom tells us that it
was wrong for the district court to rule on the substance of the federal takings
claim. The district court should have remanded the takings claim for lack of
compliance with Williamson County/First
English. This apparent error was not noted by the Supreme Court, which is
unsurprising since it was of no significance to the issue in the cases. There
were other federal claims that justified removal,[133] thus, the Supreme Court proceeded to the question of
supplemental jurisdiction over the state issue.
Perhaps conventional wisdom is
wrong, and perhaps the district court’s decision on the federal takings claim
can be viewed as an exercise of supplemental jurisdiction, as I suggest in the
immediately preceding section. That is, the district court having jurisdiction
over the equal protection and due process claims had the supplemental jurisdiction
over the federal takings claim. Alternatively, removal may have been deemed
conclusive evidence that no state remedy existed, giving the court jurisdiction
on the authority of Williamson County’s
unavailable forum rule.
The College of Surgeons district courts’ exercise of jurisdiction over
a federal takings claim via removal does not stand alone. In Garneau v. City of Seattle,[134] the Ninth Circuit ruled on the merits of a federal facial
takings claim that had been removed from state court by the city. Similarly, in
New Pulaski Company Limited Partnership
v. Baltimore,[135] the Fourth Circuit heard a federal takings claim by
removal.
In such cases, three possibilities
exist. One, the court assumes that the
city’s removal constitutes conclusive evidence that resort to the state court
is futile, and thus jurisdiction proper under Williamson County. Two, the court finds it proper to exercise
supplemental jurisdiction over the otherwise incomplete claim federal claim.
This requires that there be another federal claim removed, which was the case
in College of Surgeons, Garneau, and Pulaski. Or, if one rejects these two
implicit findings of jurisdiction, a third possibility is that the court does
not have jurisdiction. The proper thing would be to remand the case to state
court under prong two of Williamson
County, but a court might not realize that jurisdiction is lacking.[136]
[1]473 U.S. 172 (1985).
[2]482 U.S. 304 (1987).
[3]Physical or regulatory, facial or as applied. See Thomas E. Roberts, Ripeness and Forum
Selection in Fifth Amendment Takings Litigation, 11 J. Land Use & Envtl. L.
37, 42-42 (1995).
[4]Section B. of Part II draws from Julian Juergensmeyer and
Thomas E. Roberts, Land Use Planning and Control Law §10.10 (West 1998).
[5]473 U.S. 172, 186, 105 S.Ct. 3108, 3116 (1985).
[6]Id. at 188, 105 S.Ct. at 3117.
[7]477 U.S. 340, 106 S.Ct. 2561, 91 L.Ed.2d 285 (1986).
[8]MacDonald, Sommer & Frates v. Yolo County, 477 U.S. 340,
353 nn. 8,9, 106 S.Ct. 2561, 2568 (1986).
[9]Sinaloa Lake Owners Ass'n v. City of Simi Valley, 882 F.2d
1398, 1402 (9th Cir.1989) cert. denied, 494 U.S. 1016, 110 S.Ct. 1317, 108
L.Ed.2e 493 (1990). But see Harris v.
City of Wichita, 862 F.Supp. 287, 291 (D.Kan.1994) (stating in dicta that law
is unclear).
[10]Yee v. City of Escondido, 503 U.S. 519, 112 S.Ct. 1522, 118
L.Ed.2d 153 (1992). See also Galbraith
v. City of Anderson, 627 N.E.2d 850 (Ind.App.1994).
[11]473 U.S. at 188, 105 S.Ct. at 3117.
[12]Id. at 193, 105 S.Ct. at 3120. But see Acierno v. Mitchell, 6 F.3d 970 (3d Cir.1993) (repeated
denials of a building permit by the building inspector did not constitute final
action where appeal to a board of adjustment available).
[13] Hernandez v. City of Lafayette, 643 F.2d 1188, 1200 (5th
Cir.1981).
[14]Hernandez v. City of Lafayette, 643 F.2d 1188, 1200 (5th
Cir.1981); Celentano City of West Haven, 815 F.Supp. 561 (D.Conn.1993). Where development permission is denied and
the land then immediately downzoned, a request for rezoning may not be required
since the recent nature of the downzoning may show finality and futility. Resolution Trust Corp. v. Town of Highland
Beach, 18 F.3d 1536 (11th Cir.1994); Hoehne v. County of San Benito, 870 F.2d
529, 535 (9th Cir.1989). But see Southern
Pacific Transp. Co. v. City of Los Angeles, 922 F.2d 498 (9th Cir.1991).
[15]MacDonald, 477 U.S. at 353,
n.9, 106 S.Ct. at 2568.
[16]117 S.Ct. 1659, 137 L.Ed.2d 980 (1997).
[17]117 S.Ct. at 1667.
[18]Sections B and C of Part III draws from Thomas E. Roberts,
Wetlands Takings Law Turns a New Page with Palazzolo - Or Does It?, National
Wetlands Newsletter (ELI Sept.-Oct. 2001).
[19]121 S.Ct. 2448 (2001).
[20]The Court previously recognized the exception in MacDonald and applied it in Lucas v.
South Carolina Coastal Council.505 U.S. 1003 (1992).
[21]Id.
[22]Part III of this article is a revision and update of Thomas
E. Roberts, Procedural Implications of Williamson
County/First English in Regulatory Takings Litigation: Herein of
Reservations, Removal, Diversity, Supplemental Jurisdiction, Rooker-Feldman,
and Res Judicata, 31 Envtl. L. Rep. 10351 (April 2001). © Thomas E. Roberts. Please refer to that
article for more complete discussions of Sections III A. and B. and C. (1).
[23]If the claim is not for compensation but to bar the act on
the basis that there is no public purpose, then the second prong of Williamson County does not apply.
Montgomery v. Carter County, 226 F.3d 758 (6th Cir.2000); Samaad v.
City of Dallas, 940 F.2d 925, 933 (5th Cir. 1991). Also, this rule
applies to actions against state and local government entities. Actions against
the federal government must be filed in the Court of Federal Claims.
[24]482 U.S. 304 (1987).
[25]526 U.S. 687, 714 (1999). The landowner was able to sue in
federal court in Del Monte Dunes
because at the time of the taking, which was before First English, California had no compensation remedy. Id. at 710.
[26]Missing from the list are Keystone Bituminous Coal Ass’n v.
DeBenedictis, 480 U.S.. 470 (1987) and Del
Monte Dunes, both occurring in states where, in pre-First English jurisdprudence, at the time of the alleged taking,
the state courts did not provide a regulatory taking compensation remedy. See
Thomas E. Roberts, Fifth Amendment Taking Claims in Federal Court: The State
Compensation Requirement and Principles of Res Judicata, 24 Urb. Law. 479,
487-488 (1992). In Suitum, supra note
16, the case was against the case proceeded in federal court. Jurisdiction was
not discussed, perhaps because the action was against a agency formed by
interstate compact. The case likely should have been tried in state court.
[27]Forseth v. Village of Sussex, 199 F.3d 363, 372 (7th
Cir.2000) (“Should plaintiffs sufficiently pursue their case in state court
only to be denied relief, they may then seek relief in federal court on their
federal substantive due process and takings claims.”) The Sixth Circuit too
recently debated whether a property owner complaining of a private taking
should be sent to sue in state court. The only purpose, said the court, would
be to have the plaintiff “vet her claims in state proceedings (such as . . . a
quiet title suit . . .) before the claims can be aired in federal courts.” Montgomery v. Carter County, 226 F.3d 758 (6th
Cir. 2000). Since it was a claim of a private taking and not one for
compensation, the court appropriately did not dismiss the claim, but to even suggest
that the plaintiff could air the matter in state court and then come back shows
a surprising lack of anticipation of the preclusion rules that will apply when
she returns.
[28]For a detailed discussion see Thomas E. Roberts, Procedural
Implications of Williamson County/First
English in Regulatory Takings Litigation: Herein of Reservations, Removal,
Diversity, Supplemental Jurisdiction, Rooker-Feldman, and Res Judicata, 31
Envtl. L. Rep. 10351 (April 2001).
[29]First English, 482 U.S. at 315-316.
[30]Dodd v. Hood River County,59 F.3d 852 (9th
Cir.1995), after remand decision, 136 F.3d 1219 (9th Cir.), cert.
den., 525 U.S. 923 (1998).
[31]Id.
[32]121 S.Ct. 2448 (2001). See discussion infra part II. B. for
discussion of the facts of Palazzolo.
[33]Id. at 2456.
[34]Avoidance techniques are discussed infra Part III D.
[35]See Rooker v. Fidelity Trust Co., 263 U.S. 413, 425 (1923) and
District of Columbia Court of Appeals v. Feldman, 460 U.S. 462 (1983).
[36]Rooker, 263 U.S. at 414.
[37]Feldman, at 486.
[38]Suzanna Sherry, Judicial
Federalism in the Trenches: the Rooker-Feldman Doctrine in Action, 74 Notre
Dame L. Rev. 1085, 1088 (1999).
[39]Rooker v. Fidelity Trust Co., 263 U.S. 413, 425 (1923).
[40]Snider v. City of Excelsior Springs, 154 F.3d 809, 811 (8th
Cir. 1998).
[41]Id., quoting Feldman,
460 U.S. at 483, n. 16.
[42]Sherry, supra note 38, at 1101.
[43]Moccio v. New York, 95 F.3d 195, 198 (2d Cir. 1996).
[44]While Rooker-Feldman
is federal law, reference to state law may be necessary in an instance when the
federal plaintiff claims that she did not raise an issue in state court because
she lacked a reasonable opportunity to do so. See, e.g., Long, at 559-560
(Illinois forcible entry and detainer law precluded state defendant/federal
plaintiff from asserting claim not germane to possession.)
[45]Long v. Shorebank Development Corp., 182 F.3d 548, 553 (7th
Cir. 1999); Fayyumi v. City of Hickory Hills, 18 F.Supp.2d 909 (N.D. Ill.
1998).
[46]Fayyumi v. City of Hickory Hills, 18 F.Supp.2d 909 (N.D.
Ill. 1998).
[47]Sherry, supra note
38.
[48]E.g., the court may have to consider what issues the party
could have presented to the state court.
[49]2001 WL 1104685 (6th Cir. 2001).
[50]See also U.S. v. Owens, 54 F.3d 271, 274 (6th
Cir. 1995) (Rooker-Feldman is
sometimes thought of as Aa combination of the abstention and res judicata
doctrines.@)
[51]401 U.S. 37 (1971).
[52]While I discuss takings cases here, where there is no
disagreement, disagreement does exist with respect to the application of Rooker-Feldman to a federal challenge to
local government conduct alleged to violate due process and equal protection,
where the state court has already found the conduct appropriate. The Seventh
Circuit has rejected its use in this setting. Homola v. McNamara, 59 F. 3d 647,
650 (7th Cir. 1995); but see Community Treatment Centers v .City of Westland,
970 F.Supp. 1197 (E.D. Mich. 1997).
[53]Snider v. City of Excelsior Springs, 154 F.3d 809, 811 (8th
Cir. 1998).
[54]266 F.3d 487 (6th Cir. 2001).
[55]See also Zealy v. City of Waukesha, 153 F.Supp.2d 970
(E.D.Wis.2001), dismissing takings claim under Rooker-Feldman and claim preclusion.
[56]The district court dismissed the case before the Michigan
appellate court decision. While the Sixth Circuit found this premature, in
hindsight it was correct, and thus harmless error. If the state trial court
decision had not been appealed and the matter had gone to the federal court on
the basis of the trial court’s incomplete or erroneous treatment of the takings
issue, the Sixth Circuit implies that a Rooker-Feldman
dismissal might not have been proper. I am not certain this is correct. But,
even if it is, the res judicata/collateral estoppel defense might apply.
[57]193 F.3d 33 (2nd Cir. 1999).
[58]512 U.S. 374 (1994).
[59]Even if one finds the distinction between the facts of Hill and Dolan unconvincing, it does not entitle the landowner to collateral
review in federal district court. That a state court may be wrong on the law
does not void its judgment. But, the court=s ruling is consistent with other
courts. Dolan involved an
individualized determination whereas the subdivision plat law of New Hampshire
was legislative.
[60]See also Snider v. City of Excelsior Springs, 154 F.3d 809 (8th
Cir. 1998) (federal plaintiffs could not challenge in federal court the result
of state condemnation action).
[61]195 F.3d 1225 (11th Cir. 1999), cert. denied 121
S.Ct. 51 (2000).
[62]Despite having prevailed by the district court=s dismissal
of the claim as unripe, the county had standing to challenge the district court=s
decision because it was harmed by the court=s rejection of the res judicata and
collateral estoppel defenses. When the (unripe) case was filed in state court,
the county wanted to be able to argue that the prior state court proceeding had
decided the matter. But, the federal
district court=s finding that the state court had not dealt with the takings
issue, if it stood, would preclude the
county from raising that argument in state court since the state court would be
bound by the federal court determination that the takings issue had not been
raised. Id. at 1230.
[63]For a complete discussion of this issue, see Thomas E. Roberts, Fifth Amendment Taking Claims in Federal
Court: The State Compensation Requirement and Principles of Res Judicata,
24 Urb. Law. 479 (1992).
[64]Grriffin v. State of Rhode Island, 760 F.2d 359 (1st
Cir.), cert. denied, 474 U.S. 845
(1985); Peduto v. City of North Wildwood, 878 F.2d 725 (3d Cir. 1989); Rainey Brothers Construction Co., Inc. v.
Memphis and Shelby County Bd. of Adjustment, 967 F.Supp. 998 (W.D.Tenn.1997),
aff’d, 178 F.3d 1295 (6th Cir.1999), cert. den. 120 S.Ct. 569
(1999); Palomar Mobilehome Park Association v. City of San Marcos, 989 F.2d 362
(9th Cir. 1993); Wilkinson v. Pitkin County, 142 F.3d 1319 (10th
Cir. 1998); Saboff v. St. John's River Water Management Dist., 200 F.3d 1356,
(11th Cir. 2000), cert. denied, 121 S.Ct. 67 (2000); Zealy v. City
of Waukesha, 153 F.Supp.2d 970 (E.D.Wis.2001).
[65]Zealy v. City of Waukesha, 153 F.Supp.2d 970 (E.D.Wis.2001),
dismissing takings claim under claim preclusion.
[66]See discussion of England
reservation, infra III, D. (2).
[67]Belevedere Military Corp. v. County of Palm Beach, 845
F.Supp. 877, 879 (S.D.Fla.1994)(If the state courts have "unequivocally
indicated that an individual in Plaintiffs' situation had no cause of action
under state law" then they need not bother asking).
[68]Aiello v. Browning-Ferris, Inc., 1993 WL 463701
(N.D.Cal.1993) (though state law not clear on whether private party acting
under color of law was liable in an inverse condemnation action, plaintiff is
required to resort to state court).
A most unusual case is Kruse v.
Village of Chagrin Falls, 74 F.3d 694, 697, n.2 (6th Cir.1996),
where the court found Ohio lacked a procedure but the court said the state need
not provide one. To the court, “self-executing” does not mean state must provide an inverse condemnation
procedure. Try telling that to California cities and counties after First English.
[69]Gamble v. Eau Claire County, 5 F.3d 285 (7th.Cir. 1993).
[70]Belevedere Military Corp. v. County of Palm Beach, 845
F.Supp. 877 (S.D.Fla.1994).
[71]104 F.Supp.2d 1368 (S.D.Fla.2000).
[72]See, e.g., Rockler v. Minneapolis Community Development Agency,
866 F.Supp. 415, 417-418 (D.Minn. 1994).
[73] 803 F.Supp. (M.D.N.C. 1992).
[74]Initially, the state supreme court had found such schemes
not per se unconstitutional as applied to a three year provision for the
removal of junk yards. State v. Joyner, 211 S.E.2d 320 (N.C. 1975), appeal dismissed, 422 U.S. 1002
(1975). Had that been all the law on
the subject, a challenge as to sign amortization would not have been futile
since one premise of the Joyner case
was that the validity of amortization schemes would be examined on a case by
case basis. Two later intermediate
court of appeals decisions, however, had ruled in favor of billboard
amortization.
[75]Schnuck v. City of Santa Monica, 935 F.2d 171 (9th Cir.
1991); Sierra Lake Reserve v. City of Rocklin, 938 F.2d 951 (9th Cir. 1991).
[76]SGB Financial Services, Inc. v. Consolidated City of
Indianapolis-Marion County, 2000 WL 680412, 2000 U.S. Dist. LEXIS 7204
(S.D.Ind.2000). The Sixth Circuit found that a landowner seeking compensation
for a physical taking did not need to file suit in the state court in Ohio,
which, according to the court, lacked a procedure for inverse condemnation
action.
[77]2000 WL 680412, 2000 U.S. Dist. LEXIS 7204 (S.D.Ind.2000).
[78]Wilkinson v. Pitkin County, 142 F.3d 1319, 1324 (10th
Cir.1998) (“We need not decide whether it is possible to reserve a federal
claim, or, if so, what must be done to reserve such a claim because at no time
did plaintiffs attempt to do so.”);Front Royal and Warren County Industrial
Park Corp. v. Town of Front Royal, 135 F.3d 275, 283 (4th Cir.
1998); Rainey Brothers Construction Co., Inc. v. Memphis and Shelby County Bd.
of Adjustment, 967 F.Supp. 998,1004, n. 5 (W.D.Tenn.1997), aff’d, 178 F.3d 1295
(6th Cir.1999), cert. den. 120 S.Ct. 569 (1999) (since no
reservation made court declined to address whether to do so would be effective
in similar cases); Peduto v. City of North Wildwood, 878 F.2d 725, 729, n. 5
(3d Cir. 1989) (noting that the district court had said that an England reservation could have been
made, the Third Circuit did not reach the issue, finding, in the absence of any
reservation, that state court litigation compelled by Williamson County barred subsequent federal court consideration of
the same issues). From a state court, see Guetersloh v. State, 930 S.W.2d 284
(Tex.App.1996), cert. denied 522 U.S. 1110 (1998).
[79]Anderson v. Charter Township of Ypsilanti, 266 F.3d 487 (6th
Cir. 2001).
[80]See Palazzolo v. Rhode Island, 121 S.Ct. 2448 (2001), and
discussion supra in part II.B.
[81]953 F.2d 1299 (11thCir. 1992).
[82]The court continues to see the reservation as an available
option, but still applies rules of preclusion. See Saboff v. St. John’s River Water Management District, 200 F.3d 1356
(11th Cir.2000), cert. denied, 121 S.Ct. 67 (2000).
[83]Jennings v. Caldo Parish School Bd., 531 F.2d 1331 (5th
Cir.1976) (the Eleventh Circuit’s predecessor circuit).
[84]953 F.2d at 1305.
[85]449 U.S. 90 (1980).
[86]465 U.S. 75 (1980).
Kathryn Kovacs, in an extended analysis, finds the Eleventh Circuit’s
extension of England inconsistent
with these subsequent Supreme Court cases dealing with preclusion. Kathryn E.
Kovacs, Accepting The Relegation Of
Takings Claims To State Courts: The Federal Courts' Misguided Attempts To Avoid
Preclusion Under Williamson County, 26 Eco.L.Q. 1 (1999).
[87]2001 WL 1104685 (6th Cir. 2001).
[88]The court should have dismissed the federal takings claim.
[89]Id. at *2.
[90]Id. at *8, citing England,
375 U.S. at 421.
[91]59 F.3d 852 (9th Cir.1995), after remand
decision, 136 F.3d 1219 (9th Cir.), cert. den., 525 U.S. 923 (1998).
[92]59 F.3d 852 (9th Cir.1995), after remand
decision, 136 F.3d 1219 (9th Cir.), cert. den., 525 U.S. 923 (1998).
[93]Counties and cities, as municipal corporations, are citizens
of their state for purposes of diversity. Regents of the University of
California v. Doe, 519 U.S. 425, 430,
n. 6 (1997) (counties); People of State of Ill. v. Kerr-McGee Chemical Corp.,
677 F.2d 571 (7th Cir. 1982)(cities).
[94]“In diversity cases the rights enjoyed under local law
should not vary because enforcement of those rights was sought in the federal
court rather than in the state court.” Ragan v. Merchants Transfer &
Warehouse Co., 337 U.S. 530 (1949).
[95]360 U.S. 185 (1959).
[96]In addition to Mashuda,
see Searl v. School Dist. No. 2, 124
U.S. 197 (1888) (ordering district court to exercise diversity jurisdiction in
condemnation case removed from state court).
[97]SK Finance SA v. La Plata County, 126 F.3d 1272, 1276 (10th
Cir. 1997); Sinclair Oil Corp. v. County of Santa Barbara, 96 F.3d 401 (9th
Cir. 1996); American Tel. & Tel. Co. v. Madison Parish Police Jury, 465
F.Supp. 168 (D.La. 1977).
[98]Vulcan Materials Co. v. City of Tehuacana, 238 F.3d 382 (5th
Cir. 2001).
[99]238 F.3d 382 (5th Cir. 2001).
[100]It was also error for the district court to dismiss the
state due process and equal protection claims and other state law claims since
diversity existed as to those as well as to the takings claim.
[101]“The City argues that to allow a district court to hear a
state takings claim in diversity is to risk the danger of a district court
reviewing its own decision regarding the state claim to determine if that
decision denied the plaintiff just compensation. We think that this would
almost never be a problem. Assume that, to prevent res judicata from impairing
its rights, a plaintiff in diversity pleads both state and federal law takings
claims. The district court, properly following Samaad, dismisses the federal
takings claim. Then, following our holding today, proceeds to try the state law
takings claim. If the plaintiff wins, no difficulty is presented because, under
the doctrine of collateral estoppel, the issue of damages may not be
relitigated. If the state remedy is inadequate, Williamson County and Samaad
allow the plaintiff to bring the federal law takings claim without first
bringing the state claim. If the plaintiff loses, the doctrine of collateral
estoppel prevents relitigation of any issues determined in the first
proceeding. It would only be in the rarest of cases wherein the denial of
compensation was due to some issue peculiar to state law that there could ever
be a second trial. This faint
possibility is not enough to justify departure from the normal rules governing
federal diversity jurisdiction over state law claims.” 238 F.3d at 386-387.
[102] 605 F.2d 1117 (9th Cir. 1979), cert. denied 445
U.S. 928 (1980).
[103]605 F.2d at 1118.
[104]Mashuda, 360 U.S. at 192.
[105]“[B]ecause the federal claim is not yet ripe precisely
because the state courts have not yet had an opportunity to consider the
parallel state takings claim, this court would turn Williamson County upside
down if it proceeded to decide SGB's state constitutional takings claim.” SGB
Financial Services, Inc. v. Consolidated City of Indianapolis-Marion County, 2000
WL 680412, 2000 U.S. Dist. LEXIS 7204 (S.D.Ind.2000).
[106]Geddes v. County of Kane, 121 F.Supp.2d 662 (N.D.Ill.2000) (plaintiffs brought equal
protection, federal takings claim, and state takings claim; the federal takings
claim was dismissed because the plaintiffs has not used their remedies under
state law. The court, however, retained the state takings claim).
[107]28 U.S.C.A. § 1367(c). See
Executive Software North America,
Inc. v. U.S. Dist. Court for Cent. Dist. of California, 24 F.3d 1545 (9th Cir.1994).
[108]120 S.Ct. 1073 (2000).
Justice Breyer, concuriring, expressed the hope that the holding would
not have the effect of “transforming run-of-the-mill zoning cases into cases of
constitutional right.@ Id. at 1075
(Breyer, J., concurring). It is difficult to imagine that the other members of
the Court wish for such a transformation either.
[109]Id. at 1074.
[110]Olech is a per curiam decision. It is one page long, and the tone
of the Court’s language is that there is nothing new here. Others, however, see
or hope for, a potential relaxation of the law, with a consequent invitation
for more lawsuits. Justice Breyer in concurrence raised the specter that
anytime a zoning official treats one landowner differently from another and in
so doing violates local law, one might claim the action to lack a rational
basis. Breyer thinks there must be an allegation of “ill will.” The Seventh
Circuit’s application of Olech in
Hilton v. City of Wheeling, 209 F.3d 1005 (7th Cir.2000), indicates
that it likes Justice Breyer’s concurrence more than the per curiam opinion.
Whether the absence of a fundamental right or suspect class requires an
allegation of ill will remains cloudy.
[111]See Cruz v. Town of Cicero, 2000 WL 967980, 2000 WL 967980
(N.D.Ill.2000).
[112]Norton v. Village of Corrales, 103 F.3d 928, 933 (10th
Cir.1996) (federal courts “should be reluctant to interfere in zoning disputes
which are local concerns”).
[113]See Macri v. King County, 126 F.3d 1125 (9th
Cir.1997) (the court dismissed the Fifth Amendment claim for failure to meet
prong two of Williamson County and it
remanded the state based inverse condemnation claim); Patel v. Penman,103 F.3d
868, cert. denied 520 U.S. 1240 (1997); Hallco Environmental Inc. v. Comanche
County Bd. of County Com'rs,149 F.3d 1190 (10th Cir. 1998); Davis v.
City of Baldwyn, 2000 WL 994469, 2000 U.S. Dist. LEXIS 9922 ( N.D.Miss. 2000); SGB Financial Services, Inc. v.
Consolidated City of Indianapolis-Marion County, 2000 WL 680412, 2000 U.S.
Dist. LEXIS 7204 (S.D.Ind.2000) (federal takings claim dismissed on ripeness
grounds, and dismisses a state takings claim on the ground that exercise of
supplemental jurisdiction was not proper.)
In Burnham v. City of Salem, 101 F.Supp.2d 26 (D.Mass.2000), a motion to
remand was denied with a conclusory statement that removal was proper. Then,
the court proceeded to rule on the merits of the due process and takings
claims, finding in the city’s favor. The state law claims were then remanded.
See also Rau v. City of Garden Plain,76 F.Supp.2d 1173 (D.
Kan.1999) (Fifth Amendment, due process, and state law claims removed; federal
court dismissed takings claim and due process based on failure of plaintiff to
sue in state court solely on state law; and remanded plaintiff to state court
to seek compensation under state procedure). See also Vilas of Lake Jackson, Ltd. v. Leon County, 121 F.3d 610,
611 (11th Cir.1997), where the Eleventh Circuit, in considering
plaintiff’s substantive due process claim, notes that the district court had
dismissed plaintiff’s federal takings claim as unripe and refused to exercise
supplemental jurisdiction over the state takings claim.
[114]823 F.Supp. 1529 (N.D.Cal.1993).
[115]See also Geddes v. County of Kane, 121 F.Supp.2d 662 (N.D.Ill.2000)
(plaintiffs brought equal protection, federal takings claim, and state takings
claim; the federal takings claim was dismissed because the plaintiffs has not
used their remedies under state law. The court, however, retained the state
takings claim).
In Moore v. City of Tallahassee, 928
F.Supp. 1140 (N.D.Fla.1995). the
property owner filed a substantive due process claim and a state takings claim
in federal court. The court said the action was originally filed in state
court. It may have been removed, but the court makes no reference to removal,
or the plaintiff himself might have dismissed his state action and refiled in
federal court. The court found both the substantive due process claim and the
state takings claim sufficient to survive summary judgment. The court did not
explain or comment in any way on its exercise of supplemental jurisdiction.
[116]I use “otherwise incomplete” as opposed to “otherwise
unripe” to draw attention to my view that Williamson County’s second prong is
not accurately described as a ripeness matter.
[117]If not legions, there are many. To save space but still
support the point, I cite only some recent circuit court opinions. See John Corp. v. City of Houston, 214
F.3d 573 (5th Cir.2000) (substantive due process ripe; takings claim
unripe); Montgomery v. Carter County, 226 F.3d 758 (6th Cir.2000);
Forseth v. Village of Sussex, 199 F.3d 363 (7th Cir.2000)
(dismissing substantive due process and takings claim for not seeking
compensation in state court, but keeping equal protection claim); McKenzie v.
City of White Hall, 112 F.3d 313 (8th Cir.1997) (dismissing takings
claim and keeping due process and equal protection claims);SK Finance SA v. La
Plata County, 126 F.3d 1272 (10th Cir.1997) (dismissing federal
takings claims for failure to pursue state remedies while recognizing original
diversity jurisdiction over state takings claim). Restigouche, Inc. v. Town of
Jupiter, 59 F.3d 1208 (11th Cir.1995).
[118]I am assuming the plaintiff has met the final decision
requirement of Williamson County.
[119]28 U.S.C.A. § 1367(a).
[120]And certainly many takings claims have been dismissed in
just such circumstances, with courts acting
as if the dismissal is obligatory.
[121]AAny civil action brought in a State court of which the
district courts of the United States have original jurisdiction, may be removed
by the defendant . . .@
[122]Eggleston v. Pierce County, 99 F.Supp.2d 1280 (W.D. Wa.
2000); Evans v. Washington County, 1999
WL 1271025, 1999 U.S. Dist. LEXIS 20036 (D. Ore. 1999) (Evans grudgingly remands on the basis of Ninth Circuit decisions,
but finds that Williamson County has
been misinterpreted). Continental
Cablevision of Michigan, Inc. v. Edward Rose Realty, Inc., 840 F.2d 16 (Table;
unpublished ) (6th Cir.1988) (where there has been a removal from
the state court, the proper course for the district court, if it should
conclude that it was without subject matter jurisdiction, would be an order of
remand).
[123]102 F.Supp.2d 431 (W.D. Mich. 2000). See also Vigilante v. Village of Wilmette, 88 F.Supp.2d 888 (N.D.
Ill. 2000).
[124]Applying deferential review, the court unsurprisingly found
the city=s traffic concerns constituted a rational basis to reject the plan. As
to the equal protection claim, the court acknowledged, pursuant to Olech, that Aa class of one@ claim was
cognizable, but the claim was nonetheless a loser. Other restaurants’
applications had been granted but they were different from McDonald=s
application. K-Mart, next to the McDonald=s lot, had a restaurant without a
drive-thru window, raising fewer traffic concerns. Other fast food restaurants
with drive-thrus either were not on the same street or had been permitted Asubstantially
before@ McDonald=s and thus were not Asimilarly situated@ for equal protection
purposes. It appears that McDonald=s came to the area late, after other
drive-thrus had overloaded the area
with traffic. That did not make it irrational or unfair for the city to
say no to one more drive-thru.
[125]See also Frustaci v. City of South Portland, 2000 WL 1310671, 2000
U.S. Dist. LEXIS 13635 (D.Me.2000); Rau v.
City of Garden Plain,76 F.Supp.2d 1173 (D. Kan.1999) (Fifth Amendment,
due process, and state law claims removed; federal court dismissed based on
failure of plaintiff to sue in state court solely on state law).
[126]53 F.Supp.2d 957 (E.D. Mich. 1999).
[127]53 F.Supp.2d at 962.
[128]A distinct matter arises where the city removes and then
moves to dismiss or seeks summary judgment
for the failure of the plaintiff to obtain a final decision, or other
ripeness-related grounds other than
Williamson County’s prong two. Medina v. City of Charleston, 1992 U.S.App.
Lexis 6489 (4th Cir.1992); Hidden Creek Stock Farms, 1993 U.S.Dist.
Lexis 16378 (E.D.Pa.1993). See also Lindell v. City of Waconia, 71
F.Supp.2d 95 (D.Minn.1999), which involved a city ordinance that limited
pull-tab gambling in bars unless sponsored by a qualifying charity. The city
removed the action, which alleged “battery” of claims, including a takings
claim. The court dismissed for lack of standing. In Davis v. City of Baldwyn,
2000 WL 994469, 2000 U.S. Dist. LEXIS 9922 (N.D.Miss.2000), the plaintiff
apparently commenced the wrong kind of action in state court. Rather than point
that out to the plaintiff or the state court judge, who likely could have
easily corrected the matter, the city removed, and asked the federal court to
dismiss the takings claim on the basis that the plaintiff had not followed the
proper state procedure. The federal court agreed. In these cases, the takings
claim is not remanded to state court, but rather, to the local land use
authorities where the plaintiff must pursue a final decision. Assuming removal
is an otherwise legitimate process, the local government is not abusing or
delaying the plaintiff by its removal. Rather, the defendant prefers the local
federal court’s view of final decision ripeness to that of the state judges.
[129]522 U.S. 156 (1997).
[130]Id. at 160.
[131]1995 WL 9243 (unpublished opinion).
[132]438 U.S. 104 (1978).
[133]In 1995, in an unpublished opinion, the district court found
against the Surgeons on the remaining federal claims of equal protection and
substantive due process, which rested on the charge that the Surgeons were
being treated unfairly by being singled out, and procedural due process claims
that alleged the state’s notice and hearing process was faulty. 1995 WL 9243
(unpublished opinion).
[134]147 F.3d 802 (9th Cir. 1998).
[135]217 F.3d 840 (4th Cir.2000).The majority found
the time had run. The dissent reasoned to the contrary Williamson County’s final decision requirement figured prominently
in the statute of limitations analysis. After all, the dissent said, the
statute should not run until a final decision has been made. But, the majority
disagreed with the dissent on when that had occurred.
[136]See also Burnham v. City of Salem, 101 F.Supp.2d 26 (D.Mass.2000),
where a motion to remand was denied with a conclusory statement that removal
was proper. Then, the court proceeded to rule on the merits of the due process
and takings claims, finding in the city’s favor. The state law claims were then