TAHOE-SIERRA PRESERVATION COUNCIL, INC.,
et al., Petitioners,
v.
TAHOE REGIONAL PLANNING AGENCY, et al.
No. 00-1167.
United States Supreme Court Amicus
Brief.
November 15, 2001.
ON WRIT OF CERTIORARI TO THE UNITED STATES
COURT OF APPEALS FOR THE NINTH
CIRCUIT
BRIEF FOR THE
UNITED STATES AS AMICUS CURIAE SUPPORTING RESPONDENTS
Theodore B. Olson Solicitor General Counsel
of Record
John C. Cruden Acting Assistant Attorney
General
Edwin S. Kneedler
Deputy Solicitor General
Malcolm L. Stewart Assistant to the Solicitor
General
Peter H. Oppenheimer Attorney Department of
Justice Washington, D.C. 20530-0001 (202) 514-2217
*I QUESTION
PRESENTED
Whether the Court of Appeals properly
determined that a temporary moratorium on land development does not constitute
a taking of property requiring compensation under the Takings Clause of the
United States Constitution.
*III TABLE OF CONTENTS
Interest
of the United States ... 1
Statement
... 2
Summary
of argument ... 8
Argument:
A
temporary development moratorium, reasonably designed to preserve the status
quo pending completion of a comprehensive land-use plan, does not effect a per
se taking of property ... 9
A.
Substantial development of real property typically requires the prior approval
of land-use authorities, and reasonable delays in development resulting from
the permit application process do not effect a taking ... 11
B. A
reasonable moratorium on development pending completion of a comprehensive
land-use plan does not constitute a per se taking under Lucas ... 16
C.
This Court's decision in First English does not suggest that a temporary
development moratorium effects a per se taking of property ... 25
Conclusion
... 30
TABLE OF AUTHORITIES
Cases:
Agins
v. City of Tiburon, 447 U.S. 255 (1980) ... 12,
14, 15
American
W. Dev., Inc. v. City of Henderson, 111 Nev. 804 (1995) ... 23
Andrus
v. Allard, 444 U.S. 51 (1979) ... 17
Armstrong
v. United States, 364 U.S. 40 (1960) ... 14
Avco
Cmty. Developers, Inc. v. South Coast Reg'l Comm'n, 17 Cal. 3d 785 (1976), cert.
denied, 429
U.S. 1083 (1977) ... 23
Block
v. Hirsh, 256 U.S. 135 (1931) ... 27
*IV California
ex rel. Van de Kamp v. Tahoe Reg'l Planning Agency, 766 F.2d 1308 (9th Cir. 1985) ... 4, 18
City
of Dallas v. Meserole, 155 S.W.2d 1019 (Tex. Civ. App. 1941) ... 25
Danforth
v. United States, 308 U.S. 271 (1939) ... 12
Dolan
v. City of Tigard, 512 U.S. 374 (1994) ... 12, 24
Downham
v. City Council, 58 F.2d 784 (E.D. Va. 1932) ...
24
First
English Evangelical Lutheran Church v. County of L.A.: 482 U.S. 304 (1987) ... 6,
25, 26, 27
210
Cal. App. 3d 1353 (1989), cert. denied, 493
U.S. 1056 (1990) ... 16
Fowler
v. Obier, 7 S.W.2d 219 (Ky. 1928) ... 24
Heckler
v. Campbell, 461 U.S. 458 (1983) ... 22
Hodel
v. Irving, 481 U.S. 704 (1987) ... 17
Jackson
Court Condominiums, Inc. v. City of New Orleans, 874 F.2d 1070 (5th Cir.1989) ... 16
Kelly
v. Tahoe Reg'l Planning Agency, 855 P.2d 1027 (Nev. 1993), cert. denied, 510
U.S. 1014 (1994) ... 16, 29
Lake
Country, Estates v. Tahoe Reg'l Planning Agency, 440 U.S. 391 (1979) ... 2
Long
Beach Equities, Inc. v. County of Ventura, 231 Cal. App. 3d 1016 (1991), cert.
denied, 505
U.S. 1219 (1992) ... 16
Loretto
v. Teleprompter Manhattan CATV Corp., 458 U.S. 419 (1982) ... 27
Lucas
v. South Carolina Coastal Council, 505 U.S. 1003 (1992) ... passim
McCurley
v. City of El Reno, 280 P. 467 (Okla. 1929) ...
24-25
*V Miller
v. Board of Pub. Works of City of L.A.. 195 Cal. 477 (1925), error dismissed, 273
U.S. 781 (1927) ... 21
Mobil
Oil Exploration & Producing Southeast, lnc. v. United Distribution Cos.,
498 U.S. 211 (1991) ... 22
Mont
Belvien Square, Ltd. v. City of Mont Belviea, 27 F. Supp. 2d 935 (S.D. Tex.
1998) ... 16
NLRB
v. Bell Aerospace Co., 416 U.S. 267 (1974) ... 22
Nollan
v. Californian Coastal Comm'n, 483 U.S. 825 (1987)
... 17
Palazzolo
v. Rhode Island, 121 S. Ct. 2448 (2001) ... 9,
10, 13, 14, 15, 18, 25, 30
Penn
Cent. Transp. Co. v. New York City, 438 U.S. 104 (1978) ... 5, 11, 24, 29
Pennsylvania
Coal Co. v. Mahon, 260 U.S. 393 (1922) ... 9, 14,
17, 21
Ruckelshaus
v. Monsanto Co., 467 U.S. 986 (1984) ... 23
Sante
Fe Vill. Venture v. City of Albuquerque, 914 F. Supp. 478 (D.N.M. 1995) ... 16
SEC
v. Chenery Corp., 332 U.S. 194 (1947) ... 22
Suitum
v. Tahoe Reg'l Planning Agency, 520 U.S. 725 (1997)
... 2-3, 13, 21
Tocco
v. New Jersey Council on Affordable Housing, 576 A.2d 328 (N.J. Super. Ct.
1990), cert. denied, 499
U.S. 937 (1991) ... 16
United
States v. General Motors Corp., 323 U.S. 373 (1945)
... 27
United
States v. Petty Motor Co., 327 U.S. 372 (1946)
... 27
United
States v. Riverside Bayview Homes, Inc., 474 U.S. 121 (1985) ... 1, 12, 13, 19
United
States Dep't of State v. Ray, 502 U.S. 164 (1991)
... 18
Western
Coal Traffic League v. Surface Transp. Bd, 216 F.3d 1168 (D.C. Cir. 2000) ... 22
*VI Williams
v. City of Central, 907 P.2d 701 (Colo. Ct. App. 1995) ... 16
Woodbury
Place Partners v. City of Woodbury, 492 N.W.2d 258 (Minn. Ct. App. 1992), cert. denied, 508
U.S. 960 (1993) ... 16
Zilber
v. Town of Moraga, 692 F. Supp. 1195 (N.D. Cal. 1988) ... 16
Constitution
and statutes:
U.S.
Const.: Art. I, § 10, Cl.1 (Contracts Clause) ... 4
Amend.
V ... 1
Just
Compensation Clause
... 1, 4, 22
Amend.
XIV (Equal Protection Clause) ... 4
Act of
Dec. 18, 1969, Pub. L. No. 91-148, 83 Stat. 360 ... 1-2
Act of
Dec. 19, 1980,
Pub. L. No. 96-551, 94 Stat. 3233 ... 2, 3
Clean
Air Act, 42
U.S.C. 7401 et seq. ... 1
Clean
Water Act, 33
U.S.C. 1251 et seq. ... 1
33
U.S.C. 1288 ... 3
Lake
Tahoe Restoration Act, Pub.
L. No. 106-506, 114 Stat. 2351 ... 2
Surface
Mining Control and Reclamation Act of 1977, 30
U.S.C. 1201 et seq. ... 1
5
U.S.C. 555(b) ... 15
5
U.S.C. 706(1) ... 15
5
U.S.C. 706(2) ... 19
42
U.S.C. 1983 ... 5
Cal.
Gov't Code (West): § 65806 (1995) ...
25
§ 65858 (1997 & Supp. 2001) ... 25
*VII Am Jur 2d, Zoning and Planning
(1992 & Supp. May 2001) ... 16
Robert
H. Freilich, Interim Development Controls: Essential Tools for Implementing
Flexible Planning and Zoning, 49 J. Urb. Law 65 (1971) ... 21
Tahoe
Regional Planning Agency, Environmental Impact Statement for Adoption of a
Regional Plan for the Lake Tahoe Basin (Feb. 1983) ... 29
*1 INTEREST OF THE UNITED STATES
Various acts of Congress provide for a
federal agency to regulate the permissible uses of privately-owned real
property, or for States to carry out such programs pursuant to federal
standards. See, e.g., Clean Water Act (CWA), 33
U.S.C. 1251 et seq.; Clean Air Act, 42
U.S.C. 7401 et seq.; Surface Mining Control and
Reclamation Act of 1977, 30
U.S.C. 1201 et seq. The United States has a
substantial interest in the proper application of the Fifth Amendment's Just
Compensation Clause to those regulatory efforts. See, e.g., United
States v. Riverside Bayview Homes, Inc., 474 U.S. 121, 126-129 (1985) (rejecting takings challenge to Corps of Engineers
permitting program under CWA). In addition, respondent Tahoe Regional Planning
Agency was created by an interstate compact between California and Nevada that
was approved by Congress. Act of Dec. 18, 1969, Pub. L. No. 91-*2 148,
83 Stat. 360; see also Act of Dec. 19, 1980,
Pub. L. No. 96-551, 94 Stat. 3233 (amendments
strengthening compact); Lake Tahoe Restoration Act, Pub.
L. No. 106-506, 114 Stat. 2351.
STATEMENT
1. The parcels of land at issue in this case
are located in environmentally sensitive areas around Lake Tahoe, an alpine
lake of unique clarity and color, attributable in part to the low levels of
nutrients that have historically been present
in the water. Pet. App. 4; see id. at 60-61. Since the 1950's, however,
substantial development in the region has created impervious surfaces such as
roads and houses that accelerate the flow of nutrients into Lake Tahoe. Id. at
5, 63. Rising nutrient levels stimulate the growth of algae, which diminishes
the lake's clarity, alters its color, and jeopardizes fish and other
lake-dwelling animal species. Id. at 4, 63.
In 1969, in an effort to halt the
accelerating environmental damage to Lake Tahoe, Congress approved the bi-state
Tahoe Regional Planning Compact. Pub. L. No. 91-148, 83 Stat. 360; see Pet.
App. 6, 65. The 1969 Compact set goals for the protection and preservation of
the lake and its surrounding basin and created respondent Tahoe Regional
Planning Agency (TRPA) as the "single agency to coordinate and regulate
development in the Basin and to conserve its natural resources." Lake
Country Estates v. Tahoe Reg'l Planning Agency, 440 U.S. 391, 394 (1979); see Pet. App. 6, 65. As required by the 1969 Compact,
respondent classified lands in the Lake Tahoe Basin according to their
environmental sensitivity; those lands most prone to erosion, because they are
either steeply sloped or located near streams or wetlands, were designated as
"high hazard," while all other lands were denominated "low
hazard." Id. at 6, 66-67.
In 1980, Congress approved amendments to the
Compact after it "had proven inadequate
for protection of the lake and its environment." *3Suitum
v. Tahoe Reg'l Planning Agency, 520
U.S. 725, 729 (1997); see Pub.
L. No. 96- 551, 94 Stat. 3233; Pet. App. 6-7, 68.
The 1980 Compact directed respondent, within 18 months and in consultation with
the States of California and Nevada and various interested agencies, to adopt
"environmental threshold carrying capacities" for the region,
including standards for air and water quality, soil conservation, vegetation
preservation, and noise. Compact Arts. II(i), V(b); Suitum,
520 U.S. at 729 n.1; Pet. App. 7 n.3. The Compact
further directed respondent to amend its regional plan within 12 months after
adoption of the carrying capacities in order to achieve and maintain those
capacities and air and water quality standards. Compact Art. V(c). The Compact
also stated that it was necessary in the meantime to "halt temporarily
works of development in the region which might otherwise absorb the entire
capability of the region for further development or direct it out of harmony
with the ultimate plan." Id. Art. VI(c). The Compact therefore imposed a
moratorium on certain large-scale development and capped the number of building
permits that could be issued. See ibid.; see generally Pet. App. 7, 69-70. At
the same time it was implementing the Compact's new requirements, respondent
was also charged with adopting a regional water quality plan under Section 208
of the Clean Water Act, 33
U.S.C. 1288. See Pet. App. 68-69.
While working
toward completion of the environmental threshold carrying capacities,
respondent adopted Ordinance 81-5 (see Pet. App. 168-169), which took effect on
August 24, 1981. Id. at 7, 70. Subject to certain exceptions, Ordinance 81-5
temporarily prohibited most residential and all commercial construction on high
hazard lands until a new regional plan was completed. Id. at 70-74. As directed
by the 1980 Compact, respondent adopted threshold carrying capacities on August
26, 1982, approximately two months after the expiration of the 18-month
deadline set forth in the Compact. Id. at 8, 74. Respondent began work on the
new regional plan but soon recognized that it would be unable to complete *4
the plan within the prescribed 12 months. Id. at 8, 74-75. Consequently, on
August 26, 1983, respondent enacted Resolution 83-21 (see id. at 170-171),
which suspended project reviews and approvals and the acceptance of new permit
applications "pending adoption of the new regional plan." Id. at 170.
Resolution 83-21 was continued in effect until the new plan was adopted on
April 26, 1984, 32 months after respondent had initially suspended most
development on high hazard lands. Id. at 8, 75.
2. On the day the 1984 regional plan was
adopted, California filed suit to block its implementation, arguing that the
plan's land-use controls were not sufficiently stringent to protect the Lake
Tahoe Basin. Pet. App. 8, 76. Shortly thereafter, the District Court for the
Eastern District of California blocked
implementation of the new regional plan, first with a temporary restraining
order and subsequently with a preliminary injunction. Id. at 8- 9, 76-77. The
preliminary injunction was affirmed on appeal, see California
ex rel. Van de Kamp v. Tahoe Regional Planning Agency, 766 F.2d 1308 (9th Cir.
1985), and it remained in place until a revised
regional plan was adopted in 1987. See Pet. App. 9, 77.
3. a. On June 25, 1984, petitioners filed
parallel suits, which were subsequently consolidated in the District of Nevada,
naming as defendants respondent TRPA, individual members of its governing
board, and the States of California and Nevada. Pet. App. 9, 12, 77-78.
Petitioners alleged violations of the Just Compensation, Due Process, Equal
Protection, and Contracts Clauses, and they requested both monetary and equitable
relief. Id. at 9, 78.
In the ensuing litigation, petitioners'
claims were divided into four time periods: Period I (August 24, 1981, to
August 26, 1983, when Ordinance 81-5 was in effect); Period II (August 27,
1983, to April 25, 1984, when Resolution 83- 21 was in effect); Period III
(April 26, 1984, to July 1, 1987, when the preliminary injunction against
implementation of *5 the 1984 Plan was in effect); and Period IV (July
2, 1987, to the present, when the 1987 Plan has been in effect). Pet. App.
9-10. Most of the claims were dismissed on various grounds in a series of
district court and court of appeals decisions. See generally id. at 79-81. However, the claims of
some of the petitioners under 42
U.S.C. 1983 for just compensation, premised on
the theory that the land-use restrictions in effect during the various periods
had effected a taking of petitioners' property, remained pending. See Pet. App.
82.
b. The district court held that petitioners'
claims regarding Period IV were barred by the applicable statutes of
limitations. Pet. App. 128-155. In a subsequent opinion, the district court
held that petitioners were entitled to just compensation for Periods I and II,
when Ordinance 81-5 and Resolution 83- 21 were in effect, but not for Period
III. Id. at 57-127.
With respect to Periods I and II, the court
first held that "[i]f ***
[respondent's] actions effected only a partial denial of economically
viable use," then the test described in Penn
Central Transportation Co. v. New York City, 438 U.S. 104 (1978), would apply and would "clearly lead[] to the
conclusion that there was no taking." Pet. App. 88. Under that test, the
court explained, given the temporary nature of the restrictions and the length
of time property was typically held in the Basin prior to development,
petitioners did not have reasonable investment-backed expectations in being
able to build single-family homes on their land while the temporary moratorium
was in effect. Id. at 88-90. The court further determined that the absence of
any evidence " regarding the specific diminution in value of any of
[petitioners'] individual properties,"
as well as the "character of the governmental action," weighed
against finding a taking under Penn Central. Id. at 90. The court explained
that respondent "took the necessary steps" to "solv[e] a serious
problem," while petitioners "retained many important rights *6
of property ownership, such as the right to exclude others from their own
land." Id. at 91.
The district court nevertheless held that
Ordinance 81-5 and Resolution 83-21 had effected a taking of petitioners'
property. The court concluded that Penn Central did not govern because the
ordinance and resolution had foreclosed "all economically viable
uses" of petitioners' property during the periods they were in effect and
thereby resulted in a " total taking" of petitioners' property under Lucas
v. South Carolina Coastal Council, 505 U.S. 1003 (1992). Pet. App. 92-101. The court rejected respondent's
contention that no taking had occurred because Ordinance 81-5 and Resolution
83-21 were "reasonable temporary planning moratoria." Id. at 109-115.
Although the court observed that it "d[id] not see how TRPA could have
reached agreement on a regional plan any sooner" than it did, id. at 115,
it read this Court's decisions in Lucas and First
English Evangelical Lutheran Church v. County of Los Angeles, 482 U.S. 304
(1987), to require compensation, at least where
the relevant moratoria did not provide for termination on a specified date. Pet. App. 113-115.
Finally, the district court held that
petitioners were not entitled to compensation for Period III because the 1984
Regional Plan was not the "proximate cause" of petitioners' inability
to develop their land during that interval. Pet. App. 101-108. Rather, the
court explained, "[t]he real cause of [petitioners'] harm after the T.R.O.
was entered was the effect of the T.R.O. and the Preliminary Injunction [see p.
4, supra], not the 1984 Plan." Id. at 106.
4. The court of appeals affirmed in part and
reversed in part. Pet. App. 1-56.
a. The court of appeals reversed the district
court's holding that petitioners were entitled to compensation for the
restrictions on development during Periods I and II. Pet. App. 14-40. The court
noted that "the only question" *7 before it was "whether
a categorical taking occurred" under Lucas, because petitioners had
disavowed any reliance on Penn Central's ad hoc balancing approach. Id. at
18-19. The court explained that, except in cases involving physical occupation
of real property, a landowner generally may not establish a taking by
demonstrating an inability to use some discrete segment of the land, even if the
effect of the restriction is to diminish the value of the property as a whole.
Id. at 20-27. The court found "no plausible basis on which to distinguish
a similar diminution in value that results from a temporary suspension of development." Id.
at 27. The court also concluded that "[i]n several ways, temporary
development moratoria promote effective planning," ibid., and that courts
should be "exceedingly reluctant to adopt rulings that would threaten the
survival of this crucial planning mechanism," id. at 28.
b. The court of appeals affirmed the district
court's holding that petitioners were not entitled to compensation for Periods
III and IV. Pet. App. 40-56. With respect to Period III, the court determined
(see id. at 40-47) that petitioners could not establish the requisite causal
link between the 1984 Regional Plan and their inability to develop their
properties because "the injunction issued [inthe parallel lawsuit]
effectively prohibited the implementation of the 1984 Plan." Id. at 43.
With respect to Period IV, the court agreed with the district court that
petitioners' takings claims were barred by the applicable statutes of
limitations. Id. at 47-56.
c. Five judges dissented from the denial of
rehearing en banc. Pet. App. 157- 167. Those judges reasoned that "[t]he
only difference between this case and Lucas is that the regulation here had a
finite duration," and they construed this Court's decision in First
English to require compensation in this setting. Id. at 159.
*8 SUMMARY
OF ARGUMENT
A. A characteristic
feature of land-use regulation is the requirement that a property owner obtain
affirmative government authorization, typically in the form of a building
permit, before commencing substantial development. Such a generally applicable
permit requirement, and the attendant inability to develop the land in the
interim, are highly unlikely to eliminate the value of real property, do not
impose inordinate burdens on isolated landowners, and are among the background
legal principles that serve to define the landowner's interests. The
application of such permitting requirements to a particular tract therefore
does not raise any serious issue under the Just Compensation Clause.
B. Temporary moratoria can serve an important
function in land-use planning and protection of critical natural resources.
Although a particular moratorium could give rise to takings concerns because of
its scope, duration, purposes, or impact on certain landowners, the mere
possibility of such effects provides no justification for a categorical rule.
Even without announcing a formal development moratorium, a permitting agency
could consider overall patterns of actual or anticipated development in ruling
on individual permit applications, and it could defer action on individual
applications pending clarification or amendment of the substantive permitting
criteria. A formal, publicly-announced temporary moratorium simply increases
the predictability and transparency of the
land-management process. And like the requirement of prior government approval
for development of an individual tract, the use of temporary moratoria covering
a broader area is a land-management tool with a well-established tradition.
C. This Court's decision in First English
does not support petitioners' claim of a per se taking. The Court in First
English specifically disavowed any suggestion that its holding encompassed
government efforts to preserve the status *9 quo pending a final
decision as to the propriety of development. The Court's decision focused on a
question of remedy--i.e., whether the government is constitutionally required
to pay compensation for a proven taking--rather than on the antecedent question
whether a taking had occurred. Likewise, the moratorium at issue here differs
sharply from the development ban in Lucas. The moratorium was temporary; it
secured a reciprocity of advantage to a broad group of landowners rather than
imposing disproportionate burdens on an isolated few; it did not effectively
press private land into public service; and it was rooted in well-established
background property-law principles.
ARGUMENT
A TEMPORARY DEVELOPMENT MORATORIUM,
REASONABLY DESIGNED TO PRESERVE THE STATUS QUO PENDING COMPLETION OF A
COMPREHENSIVE LAND-USE PLAN, DOES NOT EFFECT A PER SE TAKING OF PROPERTY
Until this Court's decision in Pennsylvania
Coal Co. v. Mahon, 260 U.S. 393 (1922), "it
was generally thought that the Takings Clause reached only a 'direct
appropriation' of property, or the functional equivalent of a 'practical ouster
of [the owner's] possession."' Lucas
v. South Carolina Coastal Council, 505 U.S. 1003, 1014 (1992) (citations omitted). The Court has since concluded,
however, that even where an owner is not divested of title to or possession of
real property, land-use regulation may effect a compensable taking if it
trenchestoo severely upon the prerogatives that have traditionally accompanied
ownership. See id.
at 1014-1019; Palazzolo
v. Rhode Island, 121 S. Ct. 2448, 2457 (2001). In
particular, regulation that permanently deprives the owner of all economically
beneficial use of land typically requires the payment of just compensation even
though it does not involve a "direct appropriation" of the property
involved. *10 Lucas,
505 U.S. at 1015-1016; see Palazzolo,
121 S. Ct. at 2457.
Lucas does not support petitioners' claim
that a per se taking occurs as a consequence of temporary development
restrictions that are intended to preserve the status quo pending a final
government decision regarding the permissible uses of the land. Significant
development of real property typically requires the prior approval of some
official body--most obviously in the form of a building
permit--and government has never been thought to "take" property
simply by requiring that it be kept in its present state during the pendency of
a reasonable deliberative process. Although a temporary development moratorium
to allow land-use authorities to determine appropriate permitting criteria is
different in some respects from the delay attendant to a permitting process,
there is no basis for petitioners' categorical claim that such a moratorium
constitutes a taking per se.
Petitioners devote considerable rhetorical
energy to the assertion that the development restrictions at issue in this case
were in fact permanent. Those contentions disregard the rulings by both courts
below, unchallenged here, that rejected petitioners' takings claims for any
period after Resolution 83-21 expired in April 1984 (see pp. 5, 6, 7, supra),
and they are simply unresponsive to the question presented as framed by this
Court, which is expressly limited to whether a "temporary moratorium"
is an ipso facto taking. See
121 S. Ct. 2589, 2589-2590 (2001). The Court's
disposition of that question, moreover, will control future cases involving
temporary moratoria, including those (presumably the vast majority) in which
development is permitted to go forward after the moratorium expires. We
therefore address the question on which this Court granted certiorari: whether
the 32-month development moratorium imposed by Ordinance 81-5 and Resolution
83-21 effected a taking of property
requiring payment of just compensation.
*11 Petitioners do not contend in this
Court that the process of developing the 1984 Regional Plan was unduly
protracted, or that the development restrictions imposed by Ordinance 81-5 and
Resolution 83-21 were more extensive than necessary to preserve the status quo
pending respondent's development of the environmental threshold carrying
capacities and completion of a new regional plan, as required by the 1980
Compact. Nor, more generally, do petitioners seek to establish a taking under
the multi-factor test set forth in Penn
Central Transportation Co. v. New York City, 438 U.S. 104 (1978). The district court specifically found that respondent
could not have completed its plan more quickly than it did and that there was
no taking under Penn Central, and on appeal petitioners disavowed any claim of
a taking under Penn Central. See pp. 6-7, supra. Petitioners raise instead the
categorical claim that any and all temporary moratoria on the issuance of
building permits are takings under this Court's decision in Lucas. In that
context, the 32- month moratorium should therefore be assumed to have been
reasonable in scope and duration, given its stated objective. [FN1]
FN1.
The district court rejected as "completely meritless" petitioners'
earlier claim that respondent had "acted in bad faith in complying with the [1980] Compact requirements." Pet. App.
68. The court found that respondent had "clearly approached its
obligations under *** the Compact *** with good faith and to the best of its
ability." Id. at 69.
A. Substantial Development Of Real Property
Typically Requires The Prior Approval Of Land-Use Authorities, And Reasonable
Delays In Development Resulting From The Permit Application Process Do Not
Effect A Taking
1. "[T]he authority of state and local
governments to engage in land use planning has been sustained against
constitutional challenge as long ago as [this Court's] decision in Village
of Euclid v. Ambler Realty Co., 272 U.S. 365 (1926)."
*12 Dolan
v. City of Tigard, 512 U.S. 374, 384 (1994). A
characteristic feature of land-use regulation is the requirement that a
property owner obtain the affirmative approval of a designated governmental
body before commencing substantial development. This Court has never suggested
that a landowner's inability to develop his property during the permit
application process presents a takings problem or requires the payment of just
compensation. Indeed, such a claim runs counter to a number of this Court's
precedents.
For example, in United
States v. Riverside Bayview Homes, Inc., 474 U.S. 121, 127 (1985), which concerned permits issued by the Corps of Engineers
for the filling of wetlands adjacent to
navigable waters, the Court observed that
"[a] requirement that a person obtain a permit before engaging in a
certain use of his or her property does not itself 'take' the property in any
sense: after all, the very existence of a permit system implies that permission
may be granted, leaving the landowner free to use the property as
desired." The Court concluded that "[o]nly when a permit is denied
and the effect of the denial is to prevent 'economically viable' use of the
land in question can it be said that a taking has occurred." Ibid. That
analysis is inconsistent with any claim that a permit requirement causes a
temporary taking whenever its effect is to prevent economically viable use of
land during the application process.
In the same vein, the Court in Agins
v. City of Tiburon, 447 U.S. 255 (1980), explained (in the context of municipal precondemnation
activities) that "[m]ere fluctuations in value during the process of
governmental decisionmaking, absent extraordinary delay, are 'incidents of
ownership. They cannot be considered as a "taking" in the
constitutional sense.' " Id.
at 263 n.9 (quoting Danforth
v. United States, 308 U.S. 271, 285 (1939)).
Any theory under which a taking would be
deemed to have occurred as a result of the time required for landowners and
responsible governmental officials to comply with and *13 implement
permit requirements would also be inconsistent with this Court's ripeness
jurisprudence. A plaintiff who asserts a regulatory takings claim must generally "allow
regulatory agencies to exercise their full discretion in considering
development plans for the property, including the opportunity to grant any
variances or waivers allowed by law. As a general rule, until these ordinary
processes have been followed the extent of the restriction on property is not
known and a regulatory taking has not yet been established." Palazzolo,
121 S. Ct. at 2459; accord Suitum
v. Tahoe Reg'l Planning Agency, 520 U.S. 725, 733-739 (1997). That analysis necessarily presumes that a permit
requirement does not itself effect a taking, even when it temporarily prevents
economically viable use of the land pending a final decision by the agency.
2. It follows a fortiori that a temporary
prohibition on development pending completion of the permit application process
does not constitute a per se taking under Lucas. The rationales on which the
Court relied in Lucas are inapplicable in that context.
First, because "the very existence of a
permit system implies that permission may be granted," Riverside
Bayview, 474 U.S. at 127, a temporary bar on
development for the duration of the permitting process leaves open the
potential for future productive uses and is therefore exceedingly unlikely to
eliminate the property's value, even on a temporary basis. Accordingly, in
contrast to the permanent construction ban at issue in Lucas, which "rendered valueless" the plaintiff's
beachfront lots, 505
U.S. at 1020, a temporary development ban
incident to the permitting process cannot reasonably be regarded as the
practical "equivalent of a physical appropriation," id.
at 1017.
Second, the Court in Lucas emphasized that
"in the extraordinary circumstance when no productive or economically
beneficial use of land is permitted," development restrictions cannot
reasonably be assumed to "secure [] an 'average *14 reciprocity of
advantage' to everyone concerned." 505
U.S. at 1017-1018 (quoting Mahon,
260 U.S. at 415). There is nothing in the least
"extraordinary," however, about land-use regulation that requires
everyone to obtain prior gov ernment authorization for significant development
within a defined geographic area. Such generally applicable requirements do not
remotely implicate "the purpose of the Takings Clause, which is to prevent
the government from 'forcing some people alone to bear public burdens which, in
all fairness and justice, should be borne by the public as a whole.' " Palazzolo,
121 S. Ct. at 2457-2458 (quoting Armstrong
v. United States, 364 U.S. 40, 49 (1960)). Rather,
the requirement of prior government approval secures a reciprocity of advantage
to landowners within the relevant area by providing greater assurance that
restrictions intended to further the interests of the community as a whole will
be enforced in a consistent manner. Cf. Agins,
447 U.S. at 262 ("The zoning ordinances
benefit the appellants as well as the public *** in assuring careful and
orderly development of residential property.").
Third, the Court concluded in Lucas that
"the functional basis for permitting the government, by regulation, to
affect property values without compensation"--that "Government hardly
could go on" if it were required to pay for every diminution in value
caused by regulation, see Mahon,
260 U.S. at 413--does not apply to the
"relatively rare situations where the government has deprived a landowner
of all economically beneficial uses" of property on a permanent basis. 505
U.S. at 1018. That functional basis plainly does
apply, however, to the effects of a prior-approval requirement that is
applicable to all owners of property in the vicinity.
Fourth, a permit requirement does not
"carry with [it] a heightened risk that private property is being pressed
into some form of public service." Lucas,
505 U.S. at 1018. In particular, the general rule
that land must remain undeveloped during the period necessary for compliance
with the *15 permit process does not reflect a determination that any
given parcel of land should be preserved in its natural state on a permanent
basis to further a public interest. That rule serves instead to assure the
integrity of the permitting process by maintaining the status quo until
land-use officials have reached a final
decision regarding the propriety of development on any particular tract.
Finally, even when land-use regulation
prevents all economically beneficial use of a parcel on a permanent basis, the
Fifth Amendment does not require the payment of just compensation if the
pertinent restriction is derived from "background principles of the
State's law of property and nuisance"--i.e., "those common, shared
understandings of permissible limitations derived from a State's legal
tradition." Palazzolo,
121 S. Ct. at 2464; see Lucas,
505 U.S. at 1029-1031. The rule that significant
development of real property requires prior government approval likewise
constitutes an established background principle. "[A]bsent extraordinary
delay" in that process, any economic loss that a landowner may suffer as a
result of the temporary inability to develop his property while he is seeking a
permit is simply an "incident[] of ownership." Agins,
447 U.S. at 263 n.9.
Significantly, moreover, a permitting system
typically is subject to built-in protections against "extraordinary
delay." Federal permitting agencies, for example, are subject to the
requirement in the Administrative Procedure Act that, "[w]ith due regard
for the convenience and necessity of the parties or their representatives and
within a reasonable time, each agency shall proceed to conclude a matter
presented to it." 5
U.S.C. 555(b) (emphasis added). That duty is
judicially enforceable under 5
U.S.C. 706(1), which authorizes a district court to "compel agency action
unlawfully withheld or unreasonably delayed." What constitutes a
"reasonable" time may vary from case to case and must take into
account the steps the agency must take to assess the proposed development. But
the existence of that statutory *16 protection and the right to enforce
it essentially remove any basis for a takings claim resulting from the
implementation of the permit process itself.
B. A Reasonable Moratorium On Development
Pending Completion Of A Comprehensive Land-Use Plan Does Not Constitute A Per
Se Taking Under Lucas
The question in this case is whether a
temporary development moratorium intended to preserve the status quo pending
the government's adoption of a comprehensive land-use plan constitutes a per se
taking under Lucas. For a number of reasons, treatment of such moratoria as per
se takings is unwarranted. [FN2]
FN2.
Courts have consistently held that development moratoria adopted by local
governments pending study and formulation of land-use plans do not effect a
taking. See, e.g. Jackson
Court Condominiums, Inc. v. City of New Orleans, 874 F.2d 1070, 1080-1082 (5th
Cir. 1989); Mont
Belvieu Square, Ltd. v. City of Mont Belvieu, 27 F. Supp. 2d 935, 942-943 (S.D.
Tex. 1998); Zilber
v. Town of Moraga, 692 F. Supp. 1195, 1206-1207 (N.D. Cal.
1988); Kelly
v. Tahoe Reg'l Planning Agency, 855 P.2d 1027, 1032- 1035 (Nev. 1993), cert. denied, 510
U.S. 1014 (1994); Long
Beach Equities, Inc. v. County of Ventura, 231 Cal. App. 3d 1016, 1035-1036
(1991), cert. denied, 505
U.S. 1219 (1992); Tocco
v. New Jersey Council on Affordable Housing, 576 A.2d 328, 329-331 (N.J. Super.
Ct. 1990), cert. denied, 499
U.S. 937 (1991); First
English Evangelical Lutheran Church v. County of L.A., 210 Cal. App. 3d 1353,
1372-1374 (1989), cert. denied, 493
U.S. 1056 (1990); McCutchan
Estates Corp. v. Evansville-Vanderburgh County Airport Auth. Dist., 580 N.E.2d
339, 342-343 (Ind. Ct. App. 1991); see also 83
Am. Jur. 2d, Zoning and Planning § §
161-163 (1992 & Supp. May 2001). The courts have reached that
conclusion even where development moratoria allegedly denied owners all
economically viable use of their property for a temporary period, so long as
the moratoria were of reasonable duration and reasonably necessary to further
the public welfare. See, e.g., Santa
Fe Vill. Venture v. City of Albuquerque, 914 F. Supp. 478, 483 (D.N.M. 1995); Williams
v. City of Central, 907 P.2d 701, 703-706 (Colo. Ct. App. 1995); Woodbury
Place Partners v. City of Woodbury, 492 N.W.2d 258, 260-263 (Minn. Ct. App.
1992), cert. denied, 508
U.S. 960 (1993).
*17 1.
Temporary moratoria differ in certain respects from the postponement of
development that necessarily results from the requirement of prior government
approval of individual permit applications. Development moratoria typically are
formally and publicly adopted by the legislature or responsible agency, and
they apply generally and uniformly to a given category of property. They may
serve a range of purposes, from affording time to study the impacts of
anticipated development, to preparing new permitting criteria, to allowing for
the installation of new infrastructure. Such temporary measures can promote
responsible regulation and sound development in ways that the individualized
permitting process sometimes cannot. See generally Pet. App. 27-28.
At the same time, because a moratorium (like
the prohibition against development during the permit process) is designed to
maintain the status quo for a temporary period pending the completion of
governmental action, it typically does not interfere with any existing uses of
property or with such essential aspects of the bundle of property rights as the
right to exclude others, see Nollan
v. California Coastal Comm'n, 483 U.S. 825 (1987),
to sell the property, see Andrus
v. Allard, 444 U.S. 51 (1979), or to transfer it
by devise or intestacy, see Hodel
v. Irving, 481 U.S. 704 (1987). For these
reasons, there is nothing inherent in the nature of a temporary moratorium on
new development to suggest that all such moratoria should be held to be takings through an extension of Lucas's
per se rule.
2. The court of appeals judges who dissented
from denial of rehearing en banc suggested that categorical treatment of
temporary moratoria as per se takings is necessary to prevent land-use agencies
from "enact[ing] one moratorium after another, perhaps indefinitely."
Pet. App. 164. The possibility that a particular interim restriction might be
abused or go "too far," Mahon,
260 U.S. at 415, however, provides no basis for a
categorical rule covering all moratoria, regardless *18 of their scope,
duration, and purpose, and the degree of development permitted at their
conclusion. The per se rule announced in Lucas has never been invoked as a
broad prophylactic, but instead has been reserved for the "extraordinary
circumstance" (Lucas,
505 U.S. at 1017) in which land-use regulation
operates as the functional equivalent of a direct appropriation of property.
[FN3] Rather, an allegation that a particular moratorium is unreasonably
protracted or unduly broad in scope--or that it is not justified by its stated
objective or imposes inordinate burdens on isolated landowners--can be more
appropriately and fully addressed under the Penn Central framework that governs
regulatory takings claims generally. See Palazzolo,
121 S. Ct. at 2467 (O'Connor, J., concurring)
("The temptation to adopt what amount to per se rules in either direction
must be resisted.").
FN3. There is no basis, either in
this case (see note 1, supra) or generally, for denying state and federal
land-use regulators the "presumption of legitimacy," United
States Dep't of State v. Ray, 502 U.S. 164, 179 (1991), that is generally accorded to the conduct of government
officials. Takings claimants should, of course, be given an adequate
opportunity to prove that particular governmental actions are abusive or
irrational. But given the strong legitimate justifications for such temporary
development moratoria, see Pet. App. 27-28, use of such planning mechanisms
cannot fairly be presumed to reflect governmental bad faith.
3. Petitioners attempt to distinguish the
temporary moratorium at issue here from the permit application process, on the
ground that a landowner who seeks a development permit "is participating
with the expectation--or at least the possibility--of obtaining development
permission at the conclusion." Pet. Br. 28. But the same presumption
should be accorded the moratorium in this case. Indeed, the process of
fashioning the 1984 Regional Plan entailed "extensive public
involvement," California
ex rel. Van de Kamp v. Tahoe Regional Planning Agency, 766 F.2d 1308, 1311 (9th
Cir. 1985), including participation by affected
landowners. And the announcement of a temporary development *19 ban certainly implied at least the
possibility that petitioners and others could "obtain[] development
permission at the conclusion." Pet. Br. 28; compare Riverside
Bayview Homes, 474 U.S. at 127.
A temporary development moratorium may
understandably be regarded by some property owners as increasing the burdens
associated with the underlying permit requirement. Because a moratorium
typically prevents the permit process from going forward at all, see Pet. App.
113, once the moratorium expires, a landowner will then confront whatever
further delays the permitting process itself entails. In addition, the
practical effect of a moratorium is to suspend the application of substantive
criteria to potential development projects while it remains in effect; where
(as here) it is contemplated that new criteria will be issued at the end of the
moratorium, it may also introduce an added measure of uncertainty as to whether
(or to what extent) development of any particular tract will be allowed. And,
finally, because no land-use agency is likely to employ moratoria on a routine
basis, the bases for challenging the agency's conduct of the permitting process
may be more familiar and better established than the grounds for contesting a
moratorium as arbitrary or factually unjustified. See 5
U.S.C. 706(2).
In the end, however, those differences in the
nature or perception of a moratorium as compared with the ordinary operation of
a permitting process either are differences
in degree or reflect merely an unsettling of unilateral or subjective
expectations concerning possible future development that are not in themselves
protected by the Just Compensation Clause. Those generalizations do not justify
categorical treatment of development moratoria as per se takings.
Agency permitting processes (and the
experience of different landowners in seeking permits under them) will
themselves vary widely in their duration and complexity. The fact that a
particular application process (or a particular landowner's invocation of that
process) lasts longer--perhaps *20 even much longer--than the average
does not necessarily mean that the relevant agency has behaved unreasonably
under the circumstances or that a taking has occurred. The per se rule
described in Lucas applies by its terms "where regulation denies all
economically beneficial or productive use of land," 505
U.S. at 1015; the burden on the landowner that in
extreme cases justifies a categorical approach is the inability to develop the
property, not the inability to have a permit application accepted for
processing. If a particular moratorium significantly increases the total period
during which a landowner is unable to develop his property, that difference in
degree may be relevant to the Penn Central analysis, but it does not amount to
a difference in kind warranting application of a per se rule. In fact, the
agency's resolution of recurring factual and
policy issues during a planning moratorium may expedite its subsequent
processing of individual permit applications.
Because a land-use agency's consideration of
individual permit applications cannot be accomplished overnight, any legal
regime that requires prior government approval has the necessary practical
effect of temporarily foreclosing significant development during the
application process. The requirement of prior government authorization thus
reflects a "conscious governmental decision to freeze temporarily all use
of property" (Pet. Br. 12) until the government has reached a final
decision, even though the postponement of development is simply a means of
preserving the status quo rather than an end in itself. Similarly here, the
freeze on processing permits for new development was not imposed for its own
sake, but was instead the byproduct of the complex and time-consuming nature of
the planning process that was required before development could proceed.
Although respondent's decision to postpone processing of development permits
until it completed the regional plan required by the Compact may have been more
definitive and extensive than is typically the case when a land-use agency
takes a particular *21 permit application under advisement, that is
scarcely a reason to treat the moratorium as a per se taking. Indeed, the
features of a moratorium that might cause it to strike some landowners as
unfair might also be seen as characteristics of orderliness, regularity, and equality of treatment in a
planning process that will affect the entire community. In particular, the
moratorium prevents the possibility that some landowners will be able to
proceed in ways detrimental to remaining landowners.
4. In determining whether proposed
construction should be permitted on an individual parcel, a land-use agency
implements broader policy goals. See, e.g., Suitum,
520 U.S. at 738 (noting "the high degree of
discretion characteristically possessed by land-use boards"). A rational
system of land- use regulation seeks to ensure that similarly-situated property
owners are treated equitably, and that permitting decisions on individual
tracts reflect an awareness of actual or anticipated development in the
surrounding area. A permitting agency that is simultaneously considering
several development applications for tracts in close proximity to each other
would be expected to assess the likely cumulative impacts of the various
proposals, and might reasonably decline to render a final decision on any of
the applications until it had determined the appropriate disposition of them
all. If a significant change in the applicable development criteria was known
to be imminent, a rational agency could take that fact into account as well in
ruling on a pending permit application. [FN4]
FN4. As one commentator has
explained, "[t]he courts have long upheld the right of a municipality to
deny administratively a building permit to a developer where the use would
conflict with a proposed change in the zoning ordinance which has been aired at
public hearing or published in a newspaper of general circulation." Robert
H. Freilich, Interim Development Controls: Essential Tools for Implementing
Flexible Planning and Zoning, 49 J. Urb. Law 65, 86 (1971).
*22 By the same token, if significant
doubt exists as to what substantive land-use standards will be adopted in the
near future, a rational permitting agency would certainly consider delaying
action on a pending application until the new standards were adopted. A
contrary approach would simply exacerbate the risk that owners of adjacent
parcels will be subject to substantially different long-term use restrictions
based on the fortuity that one owner submits a development application slightly
before the other. That result would be at odds both with sound land-management
principles and with the values that the Just Compensation Clause is intended to
protect.
Thus, with or without the use of formal
temporary development moratoria, land- management agencies could legitimately
defer action on individual permit applications pending clarification or
amendment of the substantive permitting criteria.
Indeed, in a variety of situations, the courts have recognized the authority of
federal administrative agencies to suspend action on permit requests or similar
applications pending consideration of possible changes to the governing
standards. See, e.g., Western
Coal Traffic League v. Surface Transp. Bd., 216 F.3d 1168, 1172-1176 (D.C. Cir.
2000) (discussing cases). Moreover, this Court
has long recognized that "[i]n performing its important functions ***, an
administrative agency must be equipped to act either by general rule or by
individual order. To insist upon one form of action to the exclusion of the
other is to exalt form over necessity." SEC
v. Chenery Corp., 332 U.S. 194, 202 (1947); see,
e.g., Mobil
Oil Exploration & Producing S.E., Inc. v. United Distribution Cos., 498
U.S. 211, 228 (1991); Heckler
v. Campbell, 461 U.S. 458, 461, 467-468 (1983); NLRB
v. Bell Aerospace Co., 416 U.S. 267, 292-294 (1974).
The Just Compensation Clause does not deprive
a land-use agency of that flexibility and require it to adopt a system of
case-by-case adjudication rather than rulemaking--or case-by-case deferral of
individual permit applications rather *23 than a moratorium of general
applicability-when the agency considers a problem that relates to a number of
separate parcels. A formal, publicly-announced temporary moratorium while the
agency develops criteria of general applicability increases the predictability
and transparency of the land-management
process, and it provides an opportunity for broad public input that would be
lacking if the agency sought to resolve recurring factual or legal issues in
the ad hoc process of individual permit processing. Treatment of express
development moratoria as per se takings would create perverse incentives for
land-use agencies to perform their functions in a less systematic and
accountable way.
5. Landowners who had not already obtained a
building permit at the time the temporary moratorium went into effect would not
have had any reasonable expectation that they would be able to develop their
property immediately. Any such "unilateral expectation" on a
landowner's part would have been inconsistent with the established requirement
that a landowner obtain a permit before commencing construction. Compare Ruckelshaus
v. Monsanto Co., 467 U.S. 986, 1005-1008 (1984).
Moreover, although zoning or other laws in effect prior to the temporary
moratorium might have allowed the landowners to obtain a permit for certain
development if they had applied for one, the landowners had no property
interest in being able to do so, and the responsible legislatures and land-use
agencies were free to amend the applicable laws, regulations, and plans.
Under the law of both California and Nevada,
as under the law of many States, a landowner ordinarily attains a "vested
right" to proceed with development despite
an intervening change in the law only if he has already received a permit and
committed substantial resources in reliance thereon. See, e.g., Avco
Cmty. Developers, Inc. v. South Coast Reg'l Comm'n, 17 Cal. 3d 785, 791 (1976), cert. denied, 429
U.S. 1083 (1977); American
W. Dev., Inc. v. City of Henderson, 111 Nev. 804, 807 (1995). Only at that point does a landowner *24 have
distinct investment-backed expectations, and a distinct property-type interest
(beyond his ownership of the land itself) in being able to proceed immediately
with development. Compare
Penn Central, 438 U.S. at 127-128; Mahon,
260 U.S. at 412, 414. These longstanding
state-law principles are entitled to substantial weight in applying the Just
Compensation Clause to this setting. See Dolan,
512 U.S. at 388-391.
6. As the court of appeals recognized,
temporary development moratoria represent "an important land-use planning
tool with a well-established tradition." Pet. App. 27; see id. at 109
("[z]oning boards, cities, counties, and other agencies [have historically]
used [interim planning moratoria] all the time to maintain the status quo
pending study and governmental decision making") (internal quotation marks
omitted). As early as 1925, the California Supreme Court sustained the validity
of an emergency interim ordinance that prohibited the construction of
multi-family dwellings in part of Los Angeles while a comprehensive zoning plan
was contemplated. Miller
v. Board of Pub. Works of City of L.A., 195 Cal. 477, 496-497 (1925), error dismissed, 273
U.S. 781 (1927). The court explained:
It is a matter of common knowledge that a
zoning plan of the extent contemplated in the instant case cannot be made in a
day. Therefore, we may take judicial notice of the fact that it will take much
time to work out the details of such a plan and that obviously it would be
destructive of the plan if, during the period of its incubation, parties
seeking to evade the operation thereof should be permitted to enter upon a
course of construction which might progress so far as to defeat in whole or in
part the ultimate execution of the plan.
195
Cal. at 496. Other courts of the same era
likewise upheld the validity of interim land use planning ordinances. See,
e.g., Downham
v. City Council, 58 F.2d 784, 788 (E.D. Va. 1932);
Fowler
v. Obier, 7 S.W.2d 219, 226 (Ky. 1928); *25Mc
Curley v. City of El Reno, 280 P. 467, 469-472 (Okla. 1929); City
of Dallas v. Meserole, 155 S.W.2d 1019, 1022-1023 (Tex. Civ. App. 1941). In 1953, the California Legislature enacted a law that
essentially codified the principles of the Miller rule. Cal.
Gov't Code § 65806 (West 1955), superseded by Cal.
Gov't Code § 65858 (West 1997 &
Supp. 2001).
The moratorium at issue in this case, and the
moratorium imposed by the Compact itself, were intended "to halt
temporarily works of development in the region
which might otherwise absorb the entire capability of the region for further
development or direct it out of harmony with the ultimate plan." 1980
Compact, Art. VI(c). The challenged moratorium therefore fits comfortably
within an established land-management tradition. The potential application of interim
development restrictions designed to maintain the status quo pending completion
of a comprehensive plan--like the requirement of affirmative government
authorization as a precondition for significant development of an individual
tract (see pp. 11-16, supra)--is among the "background principles" (Palazzolo,
121 S. Ct. at 2464) that have long served to
define the property interests of landowners within the Lake Tahoe region. So
long as the 32-month moratorium at issue here was reasonable in scope and
duration--a proposition that petitioners do not here contest--it did not give
rise to a taking, even if it foreclosed immediate economically beneficial use
of some parcels during the period that it was in effect.
C. This Court's Decision In First English
Does Not Suggest That A Temporary Development Moratorium Effects A Per Se
Taking Of Property
1. The Court in First English specifically
noted that its decision "d [id] not deal with the quite different
questions that would arise in the case of normal delays in obtaining building
permits, changes in zoning ordinances, variances, and the like which are not
before us." 482
U.S. at *26321
(emphasis added). The Court thus disavowed any suggestion that its holding
encompassed government efforts to preserve the status quo pending a final
decision as to the propriety of development. The underscored language,
moreover, indicates that the Court did not distinguish between delays resulting
from the government's application of existing permitting standards to
individual permit applications and delays resulting from actual or anticipated
changes to the standards themselves.
2. In First English, the Court held that
"where the government's activities have already worked a taking of all use
of property, no subsequent action by the government can relieve it of the duty
to provide compensation for the period during which the taking was
effective." 482
U.S. at 321. In holding that the case was ripe
for decision, the Court emphasized that the California Court of Appeal had
assumed the existence of a taking, but had nevertheless affirmed the trial
court's dismissal of the landowner's claim for damages on the ground that the
remedy for any taking was limited to equitable relief. Id.
at 311. This Court found that "[It]he [state
court's] disposition of the case on these grounds isolates the remedial
question for our consideration." Ibid. The holding of First English was
thus limited to the appropriate relief for an established (or assumed) taking;
the Court did not decide the antecedent question whether a taking had occurred.
3. The Court in
First English framed the question presented as whether the Constitution
"require[s] compensation as a remedy for 'temporary' regulatory
takings--those regulatory takings which are ultimately invalidated by the
courts." 482
U.S. at 310. The Court thus focused on
development restrictions that are "retrospectively temporary," Pet.
App. 111--i.e., that are intended when adopted to be permanent and are
"rendered temporary only when an ordinance that effects a taking is struck
down by a court," id. at 30. Absent a requirement to pay compensation in
that setting, a governmental body could impose draconian constraints *27
on development, defend against the ensuing takings claims in court, and simply
rescind the offending regulation without financial liability if the litigation
terminated unfavorably. A development moratorium that is intended from the
outset to remain in effect only for a limited period raises no comparable
danger of manipulation.
4. In discussing the remedial issue in First
English, the Court observed, by way of analogy, that "[t]he United States
has been required to pay compensation for leasehold interests of shorter
duration than" the period (slightly less than seven years) between the
effective date of the challenged land-use restriction and the California
Supreme Court's denial of review. 482
U.S. at 319. As the district court in this case
pointed out, at least two of the cases on which the First English Court relied
"involved appropriations of property
that were prospectively temporary--the government had appropriated leasehold
interests with fixed termination dates." Pet. App. 114. The district court
believed that analogy in First English supported the finding of a taking here.
Ibid.
The district court was mistaken for two
reasons. First, this Court has distinguished for takings purposes between a
permanent physical occupation and a temporary physical invasion of real
property. See Loretto
v. Teleprompter Manhattan CATV Corp., 458 U.S. 419, 428, 433, 444 (1982); Lucas,
505 U.S. at 1015, 1028-1029. Any analogy between
physical and regulatory takings therefore does not support the view that a
temporary ban on economically productive uses of land effects a per se taking.
Cf. Block
v. Hirsh, 256 U.S. 135, 157 (1921) (Holmes, J.)
("A limit in time, to tide over a passing trouble, well may justify a law
that could not be upheld as a permanent change.").
Second, in the cases involving leasehold
interests to which the district court referred--United States v. Petty
Motor Co., 327 U.S. 372 (1946), and United
States v. General Motors Corp., 323 U.S. 373 (1945)--the
governmental action *28 ousted the private occupant in favor of the
government's occupying and using the property for its own purposes It therefore
would have constituted a taking if the property had never been leased. Here, by
contrast, the moratorium resulted in no interference with petitioners' right to
exclude others from their property, no
occupation or use of the property by the government for its own purposes, and
no deprivation of any other fundamental "stick" in the bundle of
rights associated with property.
The Court may nevertheless assume, arguendo,
that there could be circumstances in which even land-use regulation that was
intended from the outset to be temporary should be analyzed under the Lucas per
se takings approach, rather than under Penn Central. That would be so, however,
only if the regulation precluded all economically viable use of property during
the period it was in effect and also shared the other characteristics of the
regulation that was found in Lucas to be a per se taking--i.e., if the
regulation imposed markedly disproportionate burdens on isolated landowners
rather than securing a reciprocity of advantage to a broad community,
effectively pressed private property into public service (albeit for a finite
period), and represented a significant departure from background property-law
principles. Compare Lucas,
505 U.S. at 1017-1018, 1029-1031. That test is
not satisfied in this case. Although the district court found (and the court of
appeals assumed for purposes of its decision) that petitioners' tracts were
insusceptibte of any economically beneficialuse during the 32-month period the
moratorium was in effect, see Pet. App. 96-101, 33--34 n.20, in all other
respects the moratorium differs sharply from the prohibition involved in Lucas.
As the district
court found, the temporary development restrictions at issue in this case
"had wide-spread application, and were not aimed at an individual
landowner." Pet. App. 86; compare Lucas,
505 U.S. at 1008 (noting that the plaintiff's
"intention with respect to the lots was to do what *29 the owners
of the immediately adjacent parcels had already done: erect single- family
residences"). [FN5] The moratorium secured a reciprocity of advantage to
landowners in the Lake Tahoe area. Because the value of petitioners' tracts is
ultimately dependent on the preservation of the region's natural beauty,
respondent's efforts to prevent unconstrained development on a temporary basis
during an orderly planning process thus benefited petitioners as well as other
landowners and the general public. See Kelly
v. Tahoe Reg'l Planning Agency, 855 P.2d 1027, 1035 (Nev. 1993), cert. denied, 510
U.S. 1041 (1994).
FN5.
The 32-month moratorium affected approximately 8000 to 9000 undeveloped
single-family lots in the Lake Tahoe Basin in the early 1980's. See J.A. 74-75.
Less than half of the acreage zoned for residential development in the Basin
was actually developed when the TRPA moratorium was instituted. See Tahoe
Regional Planning Agency, Environmental Impact Statement for Adoption of a
Regional Plan for the Lake Tahoe Basin 11 (Feb. 1983). The fact that the
moratorium was limited to new development, and did not require the destruction of existing
buildings, is neither anomalous nor unfair. Respondent's decision not to
disturb existing uses of land in the Basin was consistent with traditional
regulatory practice. See, e.g., Penn
Central, 438 U.S. at 125 ("Zoning laws generally
do not affect existing uses of real property."). A requirement that
existing homes be leveled, moreover, would have destroyed distinct property
interests of their owners--i.e., the houses themselves--that the owners of
undeveloped parcels did not have.
The moratorium did not reflect a final
determination that maintenance of the relevant lands in their natural state was
necessary or desirable for its own sake. It was instead adopted simply to
preserve the status quo pending completion of a comprehensive regional plan.
Its promulgation therefore creates no "heightened risk that private
property is being pressed into some form of public service." Lucas,
505 U.S. at 1018.
Finally, requiring a landowner to defer
development for a reasonable period, while government officials determine
whether improvement of the land is consistent with criteria *30 that are
necessary to protect vital natural resources, fully accords with applicable
background property-law principles-- "those common, shared understandings
of permissible limitations derived from a State's
legal tradition." Palazzolo,
121 S. Ct. at 2464. The requirement of prior
government authorization of significant development was "a preexisting
limitation upon the landowner's title." Lucas,
505 U.S. at 1028-1029. Respondent might have
deferred ruling on any particular permit application for a reasonable period of
time pending completion of the 1984 Regional Plan, without effecting a taking
of the parcel for which development authorization was sought. The formal
announcement that a temporary development ban would also apply to other parcels
benefits rather than injures the parcel owner, and it provides nobasis for
triggering a per se constitutional rule.
CONCLUSION
The judgment of the court of appeals should
be affirmed.
U.S.Amicus.Brief,2001.
Tahoe-Sierra
Preservation Council, Inc. v. Tahoe Regional Planning Agency
2001 WL 1488022 (U.S.Amicus.Brief)